The invention relates to a foundation soil consolidation method which is simple and reasonable. The ground surface settlement and the ground surface settlement rate are observed and calculated through a settlement scale board, the heap loading rate is reasonably controlled, the blind excessive heap loading situation is avoided according to the actual condition, and therefore the whole construction process is economical and reasonable; according to detection data, it is obtained that the consolidation change of soil is very small after first-stage heap preloading is performed for ten days, two-stage heap loading can be performed, construction does not need to be performed according to most of the designs that first-stage heap loading needs a 30-day preloading process, and the consolidation degree of the soil is more than 90 percent when the overall construction period is 60 days. According to the foundation soil consolidation method, plastic drainage plates and blind ditches are closely distributed, therefore, water in the soil can be drained quickly, the water is prevented from flowing back into the soil through the penetration role, and the consolidation process is effectively facilitated.
The invention relates to a foundation soil consolidation method which is simple and reasonable. The ground surface settlement and the ground surface settlement rate are observed and calculated through a settlement scale board, the heap loading rate is reasonably controlled, the blind excessive heap loading situation is avoided according to the actual condition, and therefore the whole construction process is economical and reasonable; according to detection data, it is obtained that the consolidation change of soil is very small after first-stage heap preloading is performed for ten days, two-stage heap loading can be performed, construction does not need to be performed according to most of the designs that first-stage heap loading needs a 30-day preloading process, and the consolidation degree of the soil is more than 90 percent when the overall construction period is 60 days. According to the foundation soil consolidation method, plastic drainage plates and blind ditches are closely distributed, therefore, water in the soil can be drained quickly, the water is prevented from flowing back into the soil through the penetration role, and the consolidation process is effectively facilitated.
Foundation soil consolidation method
MA HUIBIAO (Autor:in)
19.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Soft soil foundation drainage consolidation equipment
Europäisches Patentamt | 2024
|FOUNDATION CONSOLIDATION STRUCTURE OF SEABED AND FOUNDATION CONSOLIDATION METHOD
Europäisches Patentamt | 2022
|Soft soil foundation drainage consolidation method and drainage device
Europäisches Patentamt | 2021
|Soft soil foundation drainage device and drainage consolidation method
Europäisches Patentamt | 2023
|Soft soil foundation settlement reduction and consolidation treatment method
Europäisches Patentamt | 2020
|