Self-circulating posterior grouting bored pile construction method
The invention provides a self-circulating posterior grouting bored pile construction method. The construction method comprises the steps of (1) determining the pile position and locating a drilling machine (5), (2) arranging a mud self-circulation facility, (3) boring and primary bore clearing, (4) fabricating a steel reinforcement cage, a sounding pipe and a grouting pipe, (4) placing the steel reinforcement cage, the sounding pipe and the grouting pipe, (5) mounting a guide pipe, (7) secondary bore clearing and mounting a waterproof hydrant, (8) pouring concrete, and (9) grouting under a high pressure. According to the self-circulating posterior grouting bored pile construction method, the supporting facilities such as a mud settling basin for recovering and recycling mud are arranged in the construction site, so that the land resources and the water resources can be effectively saved, the pollution of the mud to the environment can be greatly reduced, and the environment can be protected; meanwhile, the construction cost is reduced; furthermore, the bearing capacity of the foundation pile can be effectively improved by about 30%, and therefore, under the circumstance of the certain load of the foundation pile, the diameter of the foundation pile can be accordingly reduced, the construction investment can be saved and the economic benefit can be further increased.
Self-circulating posterior grouting bored pile construction method
The invention provides a self-circulating posterior grouting bored pile construction method. The construction method comprises the steps of (1) determining the pile position and locating a drilling machine (5), (2) arranging a mud self-circulation facility, (3) boring and primary bore clearing, (4) fabricating a steel reinforcement cage, a sounding pipe and a grouting pipe, (4) placing the steel reinforcement cage, the sounding pipe and the grouting pipe, (5) mounting a guide pipe, (7) secondary bore clearing and mounting a waterproof hydrant, (8) pouring concrete, and (9) grouting under a high pressure. According to the self-circulating posterior grouting bored pile construction method, the supporting facilities such as a mud settling basin for recovering and recycling mud are arranged in the construction site, so that the land resources and the water resources can be effectively saved, the pollution of the mud to the environment can be greatly reduced, and the environment can be protected; meanwhile, the construction cost is reduced; furthermore, the bearing capacity of the foundation pile can be effectively improved by about 30%, and therefore, under the circumstance of the certain load of the foundation pile, the diameter of the foundation pile can be accordingly reduced, the construction investment can be saved and the economic benefit can be further increased.
Self-circulating posterior grouting bored pile construction method
HU JIANXING (Autor:in) / LIU JUN (Autor:in) / WANG ZHENYA (Autor:in) / SHI YANYU (Autor:in) / HE YUYANG (Autor:in)
19.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Post-grouting grouting device for bored pile and grouting method
Europäisches Patentamt | 2022
|Cast-in-situ bored pile post-grouting technology construction method
Europäisches Patentamt | 2022
|Post-grouting construction process for cast-in-situ bored pile
Europäisches Patentamt | 2024
|