Turnable top-down method steel pipe column verticality adjusting guide device and construction method thereof
The invention provides a turnable top-down method steel pipe column verticality adjusting guide device and a construction method thereof. The verticality adjusting guide device comprises a permanent steel pipe column, an upper section verticality adjusting steel tube, a lower section verticality adjusting steel tube and a connection screw rod; the upper section verticality adjusting steel tube and the lower section verticality adjusting steel tube are connected through a flange, and the lower section verticality adjusting steel tube and the permanent steel pipe column are connected through a flange; after pile body pore forming is finished, a lower pile body reinforcement cage is hoisted, then the whole verticality adjusting guide device is hoisted, verticality adjustment and fixing are carried out on the steel pipe column through a ground verticality adjusting positioning platform, pile body concrete is poured, the ground verticality adjusting positioning platform is removed after the pile body concrete solidifies primarily, an upper flange bolt and the upper section verticality adjusting steel tube are detached firstly, then the connection screw rod is screwed, and finally the lower section verticality adjusting steel tube is detached, so that detachment and repeated use of a non-effective section steel pipe column above a top-down method interface layer are achieved. On one hand, top-down method steel pipe column verticality construction control requirements are taken into consideration, and meanwhile construction temporary measure investment is also reduced. The device is low in manufacturing cost, can be recycled and used and is easy and convenient to construct.
Turnable top-down method steel pipe column verticality adjusting guide device and construction method thereof
The invention provides a turnable top-down method steel pipe column verticality adjusting guide device and a construction method thereof. The verticality adjusting guide device comprises a permanent steel pipe column, an upper section verticality adjusting steel tube, a lower section verticality adjusting steel tube and a connection screw rod; the upper section verticality adjusting steel tube and the lower section verticality adjusting steel tube are connected through a flange, and the lower section verticality adjusting steel tube and the permanent steel pipe column are connected through a flange; after pile body pore forming is finished, a lower pile body reinforcement cage is hoisted, then the whole verticality adjusting guide device is hoisted, verticality adjustment and fixing are carried out on the steel pipe column through a ground verticality adjusting positioning platform, pile body concrete is poured, the ground verticality adjusting positioning platform is removed after the pile body concrete solidifies primarily, an upper flange bolt and the upper section verticality adjusting steel tube are detached firstly, then the connection screw rod is screwed, and finally the lower section verticality adjusting steel tube is detached, so that detachment and repeated use of a non-effective section steel pipe column above a top-down method interface layer are achieved. On one hand, top-down method steel pipe column verticality construction control requirements are taken into consideration, and meanwhile construction temporary measure investment is also reduced. The device is low in manufacturing cost, can be recycled and used and is easy and convenient to construct.
Turnable top-down method steel pipe column verticality adjusting guide device and construction method thereof
WANG HUI (Autor:in) / ZHAO JUN (Autor:in) / WU YANHONG (Autor:in) / SUN QING (Autor:in) / ZHOU HUANYU (Autor:in) / WANG LEI (Autor:in) / ZHONG YONG (Autor:in)
02.09.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Positioning verticality adjusting device and steel pipe column positioning construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Embedded steel column verticality adjusting system and construction method thereof
Europäisches Patentamt | 2022
|Steel pipe column accurate positioning and verticality adjusting method and device
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|