Pseudo-classic building base coat construction method
The invention discloses a pseudo-classic building base coat construction method, which comprises the following steps of: 1, coating and brushing a zinc chloride solution on a base layer of a concrete component, and cleanly clearing separated substances after salt-containing alkaline substances in the concrete component are separated out; 2, coating and brushing concrete interface processing agents on the base layer of the concrete component; 3, constructing peptizing base coat on the concrete component, and concretely and sequentially performing seam putty construction, lining putty construction and general putty construction in sequence; 4, performing oil operation on the peptizing base coat; 5, performing oil putty base coat construction on the basis of the peptizing base coat, and concretely and sequentially performing medium putty construction and fine putty construction; and 6, performing raw oil operation construction on the oil putty base coat. The method has the advantages that no saponification phenomenon occurs during the painting and colored drawing on the base coat completed by using the method; the control problem of saponification of the pseudo-classic building painting and colored drawing is solved; and the integral construction quality level of the pseudo-classic building painting and colored drawing is greatly improved.
Pseudo-classic building base coat construction method
The invention discloses a pseudo-classic building base coat construction method, which comprises the following steps of: 1, coating and brushing a zinc chloride solution on a base layer of a concrete component, and cleanly clearing separated substances after salt-containing alkaline substances in the concrete component are separated out; 2, coating and brushing concrete interface processing agents on the base layer of the concrete component; 3, constructing peptizing base coat on the concrete component, and concretely and sequentially performing seam putty construction, lining putty construction and general putty construction in sequence; 4, performing oil operation on the peptizing base coat; 5, performing oil putty base coat construction on the basis of the peptizing base coat, and concretely and sequentially performing medium putty construction and fine putty construction; and 6, performing raw oil operation construction on the oil putty base coat. The method has the advantages that no saponification phenomenon occurs during the painting and colored drawing on the base coat completed by using the method; the control problem of saponification of the pseudo-classic building painting and colored drawing is solved; and the integral construction quality level of the pseudo-classic building painting and colored drawing is greatly improved.
Pseudo-classic building base coat construction method
ZENG ANNING (Autor:in) / LU HUALIN (Autor:in) / ZENG XIUYING (Autor:in) / WANG YAN (Autor:in) / JIAO CHUNYU (Autor:in) / PAN NING (Autor:in) / WEI YUAN (Autor:in) / BI MENGYA (Autor:in)
16.09.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2024
|Fabricated construction method for pseudo-classic building
Europäisches Patentamt | 2022
|Fabricated construction method of pseudo-classic building
Europäisches Patentamt | 2024
|Fabricated construction method for pseudo-classic building
Europäisches Patentamt | 2021
|