Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction waste recycling method and subsequent hollow thermal-insulation wall construction method
The invention relates to a construction waste recycling method which can smash construction wastes and categorize the construction wastes to recycle as new construction materials. The invention further relates to a hollow thermal-insulation wall construction method which can use totally-recycled fine aggregates and slags to construct the hollow thermal-insulation wall. The construction method has the advantages that the thermal-insulation wall is poured on a construction site, a manual brick wall building method is replaced, wall body concrete mixing and building structure concrete mixing are synchronously poured on site according to the different requirements of concrete mixing materials, and seamless connection of a wall body and a building structure is achieved; the wall body is good in overall sealing performance and high in overall density, and the quality of the wall body is much better than a brick wall body; the construction method is simple in process, the building wall body and the building structure are integrally poured at one step, and the construction speed can be increased by 20-40% as compared with current construction speed.
Construction waste recycling method and subsequent hollow thermal-insulation wall construction method
The invention relates to a construction waste recycling method which can smash construction wastes and categorize the construction wastes to recycle as new construction materials. The invention further relates to a hollow thermal-insulation wall construction method which can use totally-recycled fine aggregates and slags to construct the hollow thermal-insulation wall. The construction method has the advantages that the thermal-insulation wall is poured on a construction site, a manual brick wall building method is replaced, wall body concrete mixing and building structure concrete mixing are synchronously poured on site according to the different requirements of concrete mixing materials, and seamless connection of a wall body and a building structure is achieved; the wall body is good in overall sealing performance and high in overall density, and the quality of the wall body is much better than a brick wall body; the construction method is simple in process, the building wall body and the building structure are integrally poured at one step, and the construction speed can be increased by 20-40% as compared with current construction speed.
Construction waste recycling method and subsequent hollow thermal-insulation wall construction method
LUO SHOUXUN (Autor:in)
23.09.2015
Patent
Elektronische Ressource
Englisch
Shale hollow brick and thermal insulation wall construction method using shale hollow brick
Europäisches Patentamt | 2024
|Prefabricated concrete hollow thermal insulation wall structure and construction process
Europäisches Patentamt | 2021
|Solid-waste-based fabricated thermal insulation wall and construction method thereof
Europäisches Patentamt | 2022
|Construction method of thermal insulation concrete wall
Europäisches Patentamt | 2020
|