Construction method for basalt brick road and tile road of skid pad
The invention discloses a construction method for a basalt brick road and a tile road of a skid pad. The construction method includes the following steps that after a precast block is installed, a pouring space is formed below the precast block, the elevation of the precast block is adjusted, and at least one grouting hole is reserved in the precast block; mortar is poured into the pouring space via the grouting holes; after laitance on the surface of the precast block is removed, chiseling is conducted on the surface of the precast block; the surface of the precast block is smeared with mortar after being moistened with water; after the back of each basalt brick or tile faces upwards and is smeared with adhesion cement mortar, the surface of the precast block smeared with the mortar is paved with the basalt bricks or the tiles; after the surface is paved with one row of basalt bricks or tiles primarily, an I-shaped beam plate is used for pressing the row of basalt bricks or tiles stably. Due to the fact that leveling and pavement are conducted sequentially, the problem that adjacent precast blocks cannot easily meet the requirement for flatness is resolved; due to the fact that grouting and pavement are conducted sequentially, disturbance on the precast block in the grouting process is avoided; in this way, the construction quality can be controlled more effectively, and the work efficiency is largely improved, and economic benefits are remarkably increased.
Construction method for basalt brick road and tile road of skid pad
The invention discloses a construction method for a basalt brick road and a tile road of a skid pad. The construction method includes the following steps that after a precast block is installed, a pouring space is formed below the precast block, the elevation of the precast block is adjusted, and at least one grouting hole is reserved in the precast block; mortar is poured into the pouring space via the grouting holes; after laitance on the surface of the precast block is removed, chiseling is conducted on the surface of the precast block; the surface of the precast block is smeared with mortar after being moistened with water; after the back of each basalt brick or tile faces upwards and is smeared with adhesion cement mortar, the surface of the precast block smeared with the mortar is paved with the basalt bricks or the tiles; after the surface is paved with one row of basalt bricks or tiles primarily, an I-shaped beam plate is used for pressing the row of basalt bricks or tiles stably. Due to the fact that leveling and pavement are conducted sequentially, the problem that adjacent precast blocks cannot easily meet the requirement for flatness is resolved; due to the fact that grouting and pavement are conducted sequentially, disturbance on the precast block in the grouting process is avoided; in this way, the construction quality can be controlled more effectively, and the work efficiency is largely improved, and economic benefits are remarkably increased.
Construction method for basalt brick road and tile road of skid pad
GUO FEI (Autor:in) / YANG BIN (Autor:in) / YAO XINCAN (Autor:in) / HONG HANJIANG (Autor:in) / LIU JIDA (Autor:in) / CHEN SHIHONG (Autor:in) / GUO YONG (Autor:in) / LI XIAOFENG (Autor:in) / ZHOU SHUPENG (Autor:in)
23.09.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Clinker brick in road construction
Engineering Index Backfile | 1935
|Bag brick, fabricated road and construction method of fabricated road
Europäisches Patentamt | 2023
|Manufacturing method of anti-skid ceramic tile and anti-skid ceramic tile
Europäisches Patentamt | 2020
|