Steel slide way jacking building layer increasing device
A steel slide way jacking building layer increasing device comprises steel corbels (2) arranged on the peripheral faces of frame columns (1) of a building, and steel slide ways (3) arranged on the frame columns (1). The steel corbels (2) are arranged at the positions away from a building foundation top face (4) by the appropriate height. A jack (5) is arranged below each steel corbel (2). Specifically, each steel slide way (3) comprises angle iron (8) longitudinally arranged on the four corners of the corresponding frame column (1), and the adjacent two pieces of angle iron (8) are connected through a detachable batten plate (6). A crossed support (7) is arranged between the steel slide ways (3) of every two adjacent steel frame columns (1). The building can be integrally elevated to a certain height, and therefore the purpose of layer increasing is achieved. By means of the layer increasing device, the construction speed is high, the period is short, the manufacturing cost is low, the effect on the surrounding environment is small, the layer increasing device is economical and practical, and therefore the layer increasing device can be applied and popularized on a large scale.
Steel slide way jacking building layer increasing device
A steel slide way jacking building layer increasing device comprises steel corbels (2) arranged on the peripheral faces of frame columns (1) of a building, and steel slide ways (3) arranged on the frame columns (1). The steel corbels (2) are arranged at the positions away from a building foundation top face (4) by the appropriate height. A jack (5) is arranged below each steel corbel (2). Specifically, each steel slide way (3) comprises angle iron (8) longitudinally arranged on the four corners of the corresponding frame column (1), and the adjacent two pieces of angle iron (8) are connected through a detachable batten plate (6). A crossed support (7) is arranged between the steel slide ways (3) of every two adjacent steel frame columns (1). The building can be integrally elevated to a certain height, and therefore the purpose of layer increasing is achieved. By means of the layer increasing device, the construction speed is high, the period is short, the manufacturing cost is low, the effect on the surrounding environment is small, the layer increasing device is economical and practical, and therefore the layer increasing device can be applied and popularized on a large scale.
Steel slide way jacking building layer increasing device
GAO ZUOPING (Autor:in)
21.10.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel slide way jacking technology and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Steel slide way for jacking displacement and installation method
Europäisches Patentamt | 2024
|Building jacking system and jacking method of building jacking system
Europäisches Patentamt | 2015
|