Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stage-by-stage wet stacking tailing drainage acceleration and consolidation device
The invention belongs to the technical field of tailing pond disaster prevention and particularly discloses a stage-by-stage wet stacking tailing drainage acceleration and consolidation device. The device comprises a main support, a main floating body, a convolution box and a slurry cake removal device. The main support is formed in the mode that the top end and the bottom end which are formed by two opposite supporting frames are connected with an upper steel ring and a lower steel ring at the same time respectively. The main floating body is arranged between the upper steel ring and the lower steel ring. A square through hole is formed in the middle of the main floating body. The two opposite supporting frames penetrate through the middle of the main floating body and are attached to the two inner sides of the square through hole respectively. The convolution box is fixedly installed in a space formed by the two opposite supporting frames. The lower steel ring of the main support is fixedly connected with the slurry cake removal device. Through the method, efficient drainage and consolidation in the whole process of sedimentation and consolidation of wet stacking tailing slurry can be achieved, the problems about tailing drainage and consolidation in the pond are effectively solved, the tailing consolidation process is accelerated, safety of the tailing pond is effectively improved, and an effective means is provided for tailing pond disaster prevention.
Stage-by-stage wet stacking tailing drainage acceleration and consolidation device
The invention belongs to the technical field of tailing pond disaster prevention and particularly discloses a stage-by-stage wet stacking tailing drainage acceleration and consolidation device. The device comprises a main support, a main floating body, a convolution box and a slurry cake removal device. The main support is formed in the mode that the top end and the bottom end which are formed by two opposite supporting frames are connected with an upper steel ring and a lower steel ring at the same time respectively. The main floating body is arranged between the upper steel ring and the lower steel ring. A square through hole is formed in the middle of the main floating body. The two opposite supporting frames penetrate through the middle of the main floating body and are attached to the two inner sides of the square through hole respectively. The convolution box is fixedly installed in a space formed by the two opposite supporting frames. The lower steel ring of the main support is fixedly connected with the slurry cake removal device. Through the method, efficient drainage and consolidation in the whole process of sedimentation and consolidation of wet stacking tailing slurry can be achieved, the problems about tailing drainage and consolidation in the pond are effectively solved, the tailing consolidation process is accelerated, safety of the tailing pond is effectively improved, and an effective means is provided for tailing pond disaster prevention.
Stage-by-stage wet stacking tailing drainage acceleration and consolidation device
OU XIAODUO (Autor:in) / WU GUANGHANG (Autor:in) / SU JIAN (Autor:in) / TAO RAN (Autor:in) / PAN XIN (Autor:in)
28.10.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Numerical simulation method for vacuum preloading drainage consolidation uranium tailing mud
Europäisches Patentamt | 2020
|Tailing pond dam body, tailing pond and stacking method of tailing pond dam body
Europäisches Patentamt | 2023
|