Construction method of steel casing guard wall of manual hole digging pile
The invention discloses a construction method of a steel casing guard wall of a manual hole digging pile. The depth of a soft soil layer is measured through a steel tube insertion method at the opening of a dug hole, and a certain thick-bottom steel plate is rolled into a round steel casing, wherein the inner diameter of the round steel casing is consistent with the outer diameter of the pile; then, the round steel casing is pressed into and penetrates through the soft soil layer through a static-pressure or mechanical method; the part, in the steel casing, of the soft soil layer is manually dug out, downward digging continues being performed through a conventional method, and the guard wall is constructed till concrete pouring is completed. According to the technical scheme, the construction method is simple and easy to implement; no special machine is needed; the construction period and the construction cost are hardly influenced; smooth construction of a manual hole digging pile foundation with the ground layer mingled with a soft soil layer is guaranteed; the construction safety and quality of pile foundation engineering are guaranteed.
Construction method of steel casing guard wall of manual hole digging pile
The invention discloses a construction method of a steel casing guard wall of a manual hole digging pile. The depth of a soft soil layer is measured through a steel tube insertion method at the opening of a dug hole, and a certain thick-bottom steel plate is rolled into a round steel casing, wherein the inner diameter of the round steel casing is consistent with the outer diameter of the pile; then, the round steel casing is pressed into and penetrates through the soft soil layer through a static-pressure or mechanical method; the part, in the steel casing, of the soft soil layer is manually dug out, downward digging continues being performed through a conventional method, and the guard wall is constructed till concrete pouring is completed. According to the technical scheme, the construction method is simple and easy to implement; no special machine is needed; the construction period and the construction cost are hardly influenced; smooth construction of a manual hole digging pile foundation with the ground layer mingled with a soft soil layer is guaranteed; the construction safety and quality of pile foundation engineering are guaranteed.
Construction method of steel casing guard wall of manual hole digging pile
JIN KAIJIAN (Autor:in) / PAN GUOQIAO (Autor:in) / LIN QINGFANG (Autor:in) / CHEN WEI (Autor:in) / ZHU LIFENG (Autor:in)
28.10.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Manual hole digging pile and construction method of manual hole digging pile
Europäisches Patentamt | 2020
|Construction method of manual hole digging pile and manual hole digging pile
Europäisches Patentamt | 2021
|Manual hole digging pile and construction method of manual hole digging pile
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Manual hole digging pile prefabricated protecting wall construction method
Europäisches Patentamt | 2020
|