Construction method of trestle based on high-altitude crawler crane
The invention provides a construction method of a trestle based on a high-altitude crawler crane. The construction method mainly comprises the following steps: selecting the type of a crawler crane; selecting the combined manner of a crawler crane; checking bearing capability; arranging a trestle supporting seat; assembling and mounting a trestle; mounting a walkway plate; strengthening trusses; arranging a supporting seat of a crawler crane host machine; mounting the crawler crane; performing a load test; and putting the crawler crane into use. According to the construction method disclosed by the invention, through the creative arrangement of a high-altitude trestle for a crawler crane in the construction of the power industry, the bottleneck problem that no place can be used for machine arrangement is solved, and the hoisting capacity and the moving capability of a crane during the reconstruction realizing energy conservation and emission reduction are greatly improved. The trestle is rapid and convenient to mount, and the crawler crane can be rapidly put into use; the reconstruction period is greatly shortened; the reconstruction cost is reduced; the equivalent usable coefficients of used machine units are increased.
Construction method of trestle based on high-altitude crawler crane
The invention provides a construction method of a trestle based on a high-altitude crawler crane. The construction method mainly comprises the following steps: selecting the type of a crawler crane; selecting the combined manner of a crawler crane; checking bearing capability; arranging a trestle supporting seat; assembling and mounting a trestle; mounting a walkway plate; strengthening trusses; arranging a supporting seat of a crawler crane host machine; mounting the crawler crane; performing a load test; and putting the crawler crane into use. According to the construction method disclosed by the invention, through the creative arrangement of a high-altitude trestle for a crawler crane in the construction of the power industry, the bottleneck problem that no place can be used for machine arrangement is solved, and the hoisting capacity and the moving capability of a crane during the reconstruction realizing energy conservation and emission reduction are greatly improved. The trestle is rapid and convenient to mount, and the crawler crane can be rapidly put into use; the reconstruction period is greatly shortened; the reconstruction cost is reduced; the equivalent usable coefficients of used machine units are increased.
Construction method of trestle based on high-altitude crawler crane
WANG ZUO (Autor:in) / QIAN PING (Autor:in) / SUN YEWEN (Autor:in) / ZHUANG HAIQING (Autor:in) / YUE JUNHUI (Autor:in) / LUAN JIANMING (Autor:in) / XU ZHIBO (Autor:in)
04.11.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2023
|Concrete floor walking trestle device for large crawler crane and mounting method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2015
|