Concrete floor walking trestle device for large crawler crane and mounting method thereof
The invention relates to a concrete floor walking trestle device for a large crawler crane and a mounting method of the concrete floor walking trestle device. The device comprises a finished roadbed box, a trestle beam, a transfer beam, an embedded part, temporary stacking plates and a connecting beam. The lower portion of the transfer beam is connected with the connecting beam and arranged on theembedded part through the connecting beam, the lower portion of the trestle beam is connected with the connecting beam and arranged on the transfer beam through the connecting beam, the finished roadbed box is laid on the upper portion of the trestle beam, and temporary stacking plates are arranged between the transfer beam and the embedded part, between the transfer beam and the trestle beam andbetween the trestle beam and the finished roadbed box. Mechanical and construction loads are transmitted to the next layer of concrete column through structural steel, the structure is simple, the safety performance is high, turnover use can be achieved, and green construction is facilitated.
本发明涉及一种用于大型履带吊上混凝土楼板行走栈桥装置及其安装方法,装置包括成品路基箱、栈桥梁、转换梁、埋件、临时码板、连系梁;所述转换梁下部连接连系梁并通过连系梁设于埋件上,所述栈桥梁下部连接连系梁并通过连系梁设于转换梁上,所述成品路基箱铺设于栈桥梁上部,所述转换梁和埋件之间、转换梁和栈桥梁之间、栈桥梁和成品路基箱之间均设有临时码板。本发明利用型钢将机械及施工荷载传递到下一层混凝土柱上,结构简单,安全性能高,可周转使用,有利于绿色施工。
Concrete floor walking trestle device for large crawler crane and mounting method thereof
The invention relates to a concrete floor walking trestle device for a large crawler crane and a mounting method of the concrete floor walking trestle device. The device comprises a finished roadbed box, a trestle beam, a transfer beam, an embedded part, temporary stacking plates and a connecting beam. The lower portion of the transfer beam is connected with the connecting beam and arranged on theembedded part through the connecting beam, the lower portion of the trestle beam is connected with the connecting beam and arranged on the transfer beam through the connecting beam, the finished roadbed box is laid on the upper portion of the trestle beam, and temporary stacking plates are arranged between the transfer beam and the embedded part, between the transfer beam and the trestle beam andbetween the trestle beam and the finished roadbed box. Mechanical and construction loads are transmitted to the next layer of concrete column through structural steel, the structure is simple, the safety performance is high, turnover use can be achieved, and green construction is facilitated.
本发明涉及一种用于大型履带吊上混凝土楼板行走栈桥装置及其安装方法,装置包括成品路基箱、栈桥梁、转换梁、埋件、临时码板、连系梁;所述转换梁下部连接连系梁并通过连系梁设于埋件上,所述栈桥梁下部连接连系梁并通过连系梁设于转换梁上,所述成品路基箱铺设于栈桥梁上部,所述转换梁和埋件之间、转换梁和栈桥梁之间、栈桥梁和成品路基箱之间均设有临时码板。本发明利用型钢将机械及施工荷载传递到下一层混凝土柱上,结构简单,安全性能高,可周转使用,有利于绿色施工。
Concrete floor walking trestle device for large crawler crane and mounting method thereof
用于大型履带吊上混凝土楼板行走栈桥装置及其安装方法
ZHANG MINGQI (Autor:in) / LI MIN (Autor:in) / CHU SHENGSHENG (Autor:in) / HU YI (Autor:in) / ZHANG KAIJIA (Autor:in)
12.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Construction method of trestle based on high-altitude crawler crane
Europäisches Patentamt | 2015
|Fabricated concrete trestle plate and mounting method thereof
Europäisches Patentamt | 2022