Construction method for prefabricated assembled concrete underflow pump station
The invention relates to construction of an underflow pump station for a metallurgical mine project. A construction method for a prefabricated assembled concrete underflow pump station comprises the steps of processing prefabricated concrete wallboards in a factory, and embedding designated embedded parts and hooks into concrete; digging a foundation pit on site, then casting a first layer of a reinforced concrete circular raft foundation of the underflow pump station, and reserving joint bars and spacer bars with sufficient vertical lengths according to the design drawing; installing the prefabricated concrete wallboards in place to form a cylindrical wall; performing plugging seepage control at joints between the wallboards by using high-pressure grouted foamed expanded grouting material; casting a second layer of the circular raft foundation of the underflow pump station; after the circular raft foundation of the underflow pump station is constructed, setting up a scaffold to cast a reinforced concrete circular top plate at the top of the pump station; and backfilling and compacting earthwork around the pump station after the pump station is constructed. The method can shorten the construction period and reduce the cost.
Construction method for prefabricated assembled concrete underflow pump station
The invention relates to construction of an underflow pump station for a metallurgical mine project. A construction method for a prefabricated assembled concrete underflow pump station comprises the steps of processing prefabricated concrete wallboards in a factory, and embedding designated embedded parts and hooks into concrete; digging a foundation pit on site, then casting a first layer of a reinforced concrete circular raft foundation of the underflow pump station, and reserving joint bars and spacer bars with sufficient vertical lengths according to the design drawing; installing the prefabricated concrete wallboards in place to form a cylindrical wall; performing plugging seepage control at joints between the wallboards by using high-pressure grouted foamed expanded grouting material; casting a second layer of the circular raft foundation of the underflow pump station; after the circular raft foundation of the underflow pump station is constructed, setting up a scaffold to cast a reinforced concrete circular top plate at the top of the pump station; and backfilling and compacting earthwork around the pump station after the pump station is constructed. The method can shorten the construction period and reduce the cost.
Construction method for prefabricated assembled concrete underflow pump station
CAO YUE (Autor:in) / WEI NAN (Autor:in) / DONG SHIYI (Autor:in) / LIU CHENGLIN (Autor:in) / LIU PEIWEN (Autor:in)
04.11.2015
Patent
Elektronische Ressource
Englisch
Europäisches Patentamt | 2024
|Prefabricated pump station base and prefabricated pump station
Europäisches Patentamt | 2022
|Integrated prefabricated pump station resin concrete barrel
Europäisches Patentamt | 2022
|Prefabricated assembled concrete trestle and construction method thereof
Europäisches Patentamt | 2022
|Prefabricated assembled irrigation pump room and construction method thereof
Europäisches Patentamt | 2021
|