Pump station adopting prefabricated concrete water inlet flow channel and construction method of pump station
The invention discloses a pump station adopting a prefabricated concrete water inlet runner and a construction method thereof.The pump station comprises a bottom plate and a water pump assembly, the prefabricated concrete water inlet runner is arranged at the top of the bottom plate, and pier walls and a rear wall are poured on the three sides of the prefabricated concrete water inlet runner; the prefabricated concrete water inlet flow channel is installed in a pump chamber formed by the bottom plate, the pier wall and the rear wall side wall, the outer side, making contact with the pier wall and the rear wall, of the prefabricated concrete water inlet flow channel has the gradient, and the pier wall and the rear wall side wall can compact the prefabricated concrete water inlet flow channel through the gradient; therefore, it is guaranteed that the prefabricated concrete water inlet flow channel and a cast-in-place main body structure are tightly combined to form a fastened whole, the possible vibration problem is avoided, the prefabricated concrete water inlet flow channel is made of concrete and is made of the same material as a bottom plate and a pier wall which are poured through concrete, and therefore connection is more compact, and the service life of the prefabricated concrete water inlet flow channel is prolonged. The water inlet channel and the main body project have the same service life.
本发明公开了一种采用预制装配式混凝土进水流道的泵站及其施工方法,包括底板和水泵组件,所述底板顶部设置有预制装配式混凝土进水流道,所述预制装配式混凝土进水流道三侧浇筑有墩墙及、后壁,所述预制装配式混凝土进水流道安装于底板、墩墙、后壁侧壁所形成泵室内,本发明的预制装配式混凝土进水流道与墩墙及、后壁接触的外侧带有坡度,可使墩墙及后壁侧壁通过坡度压实预制装配式混凝土进水流道,从而保证预制装配式混凝土进水流道与现浇主体结构结合紧密,形成紧固的整体,避免了可能存在的振动问题,且预制装配式混凝土进水流道为混凝土制成,其与混凝土浇筑的底板及墩墙材质相同,因此连接的更为密实,进水流道与主体工程同寿命。
Pump station adopting prefabricated concrete water inlet flow channel and construction method of pump station
The invention discloses a pump station adopting a prefabricated concrete water inlet runner and a construction method thereof.The pump station comprises a bottom plate and a water pump assembly, the prefabricated concrete water inlet runner is arranged at the top of the bottom plate, and pier walls and a rear wall are poured on the three sides of the prefabricated concrete water inlet runner; the prefabricated concrete water inlet flow channel is installed in a pump chamber formed by the bottom plate, the pier wall and the rear wall side wall, the outer side, making contact with the pier wall and the rear wall, of the prefabricated concrete water inlet flow channel has the gradient, and the pier wall and the rear wall side wall can compact the prefabricated concrete water inlet flow channel through the gradient; therefore, it is guaranteed that the prefabricated concrete water inlet flow channel and a cast-in-place main body structure are tightly combined to form a fastened whole, the possible vibration problem is avoided, the prefabricated concrete water inlet flow channel is made of concrete and is made of the same material as a bottom plate and a pier wall which are poured through concrete, and therefore connection is more compact, and the service life of the prefabricated concrete water inlet flow channel is prolonged. The water inlet channel and the main body project have the same service life.
本发明公开了一种采用预制装配式混凝土进水流道的泵站及其施工方法,包括底板和水泵组件,所述底板顶部设置有预制装配式混凝土进水流道,所述预制装配式混凝土进水流道三侧浇筑有墩墙及、后壁,所述预制装配式混凝土进水流道安装于底板、墩墙、后壁侧壁所形成泵室内,本发明的预制装配式混凝土进水流道与墩墙及、后壁接触的外侧带有坡度,可使墩墙及后壁侧壁通过坡度压实预制装配式混凝土进水流道,从而保证预制装配式混凝土进水流道与现浇主体结构结合紧密,形成紧固的整体,避免了可能存在的振动问题,且预制装配式混凝土进水流道为混凝土制成,其与混凝土浇筑的底板及墩墙材质相同,因此连接的更为密实,进水流道与主体工程同寿命。
Pump station adopting prefabricated concrete water inlet flow channel and construction method of pump station
一种采用预制装配式混凝土进水流道的泵站及其施工方法
XU PENGFEI (Autor:in) / CHANG GUI (Autor:in) / LI YANLIANG (Autor:in) / WANG XU (Autor:in) / LU FEIXIANG (Autor:in) / GUO DANPING (Autor:in) / ZHUANG MENGRU (Autor:in) / YAN BAIYANG (Autor:in) / BAI CHUNYU (Autor:in)
29.11.2024
Patent
Elektronische Ressource
Chinesisch
Prefabricated pump station base and prefabricated pump station
Europäisches Patentamt | 2022
|Construction method for prefabricated assembled concrete underflow pump station
Europäisches Patentamt | 2015
|Integrated prefabricated pump station lifting pump station
Europäisches Patentamt | 2021
|