Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A testing structure of a steel pipe inclined pile self-balance method comprises a steel pipe inclined pile, and a load box arranged in the steel pipe inclined pile. The testing structure is characterized in that an upper baffle and a lower baffle are installed in the steel pipe inclined pile, and a sliding groove is formed in the lower baffle; a lead steel wire penetrates the load box and extends to the portion below the sliding groove, and the bottom end of the lead steel wire is connected with a check block. A lead ring is arranged at the top end of the steel pipe inclined pile. The lead steel wire extends to the top of the steel pipe inclined pile and is buckled on the lead ring. Compared with the prior art, the testing structure has the beneficial effects that device construction is easy; meanwhile, the angle of a reference beam can be adjusted specially for the inclination angle of the steel pipe inclined pile, and the steel pipe inclined pile and the reference beam can rapidly correspond; and after construction is finished, the load box can be pulled to be recycled, and the testing structure is suitable for application and popularization.
A testing structure of a steel pipe inclined pile self-balance method comprises a steel pipe inclined pile, and a load box arranged in the steel pipe inclined pile. The testing structure is characterized in that an upper baffle and a lower baffle are installed in the steel pipe inclined pile, and a sliding groove is formed in the lower baffle; a lead steel wire penetrates the load box and extends to the portion below the sliding groove, and the bottom end of the lead steel wire is connected with a check block. A lead ring is arranged at the top end of the steel pipe inclined pile. The lead steel wire extends to the top of the steel pipe inclined pile and is buckled on the lead ring. Compared with the prior art, the testing structure has the beneficial effects that device construction is easy; meanwhile, the angle of a reference beam can be adjusted specially for the inclination angle of the steel pipe inclined pile, and the steel pipe inclined pile and the reference beam can rapidly correspond; and after construction is finished, the load box can be pulled to be recycled, and the testing structure is suitable for application and popularization.
Structure and method for testing steel pipe inclined pile load box
Europäisches Patentamt | 2015
|Recyclable spiral steel pipe pile self-balance testing device and method
Europäisches Patentamt | 2020
|Recyclable spiral steel pipe pile self-balance testing device
Europäisches Patentamt | 2021
|Self-balancing load box testing structure and method for inclined steel pipe pile of bridge
Europäisches Patentamt | 2015
|Steel tube batter pile self-balance method load box testing structure and method
Europäisches Patentamt | 2015
|