Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated transparent pipe type pile clamping structure for high pile wharf
The invention relates to the field of construction structures of high pile wharfs, in particular to a fabricated transparent pipe type pile clamping structure for a high pile wharf. The pile clamping structure is fixed to the upper ends of engineering piles of the high pile wharf, and is characterized in that the pile clamping structure comprises a plurality of vertical rods which are arranged side by side and at the upper ends of the engineering piles; the lower ends of the vertical rods are fixed to the inner sides of the upper ends of the engineering piles, and transverse supporting rods are arranged between the vertical rods; and parallel connecting structures are arranged at the upper ends of the vertical rods, and the parallel connecting structure on each engineering pile is connected with the parallel connecting structures on the adjacent engineering piles to form an overall structure. According to the pile clamping structure, the problems that in the prior art, the welding work load is large, and stressing is not reasonable can be solved well, the safety of wharf construction is improved, so that the whole construction process is faster, construction efficiency is improved, and high popularization value is achieved.
Fabricated transparent pipe type pile clamping structure for high pile wharf
The invention relates to the field of construction structures of high pile wharfs, in particular to a fabricated transparent pipe type pile clamping structure for a high pile wharf. The pile clamping structure is fixed to the upper ends of engineering piles of the high pile wharf, and is characterized in that the pile clamping structure comprises a plurality of vertical rods which are arranged side by side and at the upper ends of the engineering piles; the lower ends of the vertical rods are fixed to the inner sides of the upper ends of the engineering piles, and transverse supporting rods are arranged between the vertical rods; and parallel connecting structures are arranged at the upper ends of the vertical rods, and the parallel connecting structure on each engineering pile is connected with the parallel connecting structures on the adjacent engineering piles to form an overall structure. According to the pile clamping structure, the problems that in the prior art, the welding work load is large, and stressing is not reasonable can be solved well, the safety of wharf construction is improved, so that the whole construction process is faster, construction efficiency is improved, and high popularization value is achieved.
Fabricated transparent pipe type pile clamping structure for high pile wharf
YU YANG (Autor:in) / ZHANG ZHIMING (Autor:in) / DUAN JIAO (Autor:in) / WANG CHAO (Autor:in) / LIANG SHENGGUANG (Autor:in)
25.11.2015
Patent
Elektronische Ressource
Englisch
Europäisches Patentamt | 2024
|Fabricated high-pile wharf structure and construction method thereof
Europäisches Patentamt | 2022
|