Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Combined bottom die based on fabricated high-pile wharf pile foundation and wharf construction method
The invention discloses a combined bottom die based on a fabricated high-pile wharf pile foundation and a wharf construction method. The combined bottom die comprises a first sub-piece and a second sub-piece. The first sub-sheet comprises a first side plate and a first top plate, the first side plate is of a semicircular cambered surface structure, the first side plate is of a semicircular annular structure, the inner ring diameter of the first side plate is the same as the diameter of the top surface of the first side plate, the first side plate and the top surface of the first side plate are seamlessly fixed, and first connecting plates are vertically arranged on the two sides of the first side plate; the second fragment comprises a second side plate and a second top plate, the second side plate is of a semicircular cambered surface structure and a semicircular annular structure, the inner ring diameter of the second side plate is the same as the diameter of the top surface of the second side plate, the second side plate and the top surface of the second side plate are seamlessly fixed, and second connecting plates are vertically arranged on the two sides of the second side plate; the first connecting plate and the second connecting plate are connected through a tensioning bolt. The method is suitable for different offset pile foundations, materials are saved, and actual construction is facilitated.
本发明公开了一种基于装配式高桩码头桩基的组合式底模及码头施工方法,包括第一分片和第二分片;所述第一分片包括第一侧板和第一顶板,所述第一侧板为半圆形弧面结构,所述第一侧板为半圆环形结构,所述第一侧板的内环直径与所述第一侧板顶面的直径相同并无缝固定,所述第一侧板的两侧垂直设置有第一连接板;所述第二分片包括第二侧板和第二顶板,所述第二侧板为半圆形弧面结构,所述第二侧板为半圆环形结构,所述第二侧板的内环直径与所述第二侧板顶面的直径相同并无缝固定,所述第二侧板的两侧垂直设置有第二连接板;所述第一连接板与第二连接板通过张紧螺栓连接。本发明适应于不同偏位桩基,即节省材料,又利于实际施工。
Combined bottom die based on fabricated high-pile wharf pile foundation and wharf construction method
The invention discloses a combined bottom die based on a fabricated high-pile wharf pile foundation and a wharf construction method. The combined bottom die comprises a first sub-piece and a second sub-piece. The first sub-sheet comprises a first side plate and a first top plate, the first side plate is of a semicircular cambered surface structure, the first side plate is of a semicircular annular structure, the inner ring diameter of the first side plate is the same as the diameter of the top surface of the first side plate, the first side plate and the top surface of the first side plate are seamlessly fixed, and first connecting plates are vertically arranged on the two sides of the first side plate; the second fragment comprises a second side plate and a second top plate, the second side plate is of a semicircular cambered surface structure and a semicircular annular structure, the inner ring diameter of the second side plate is the same as the diameter of the top surface of the second side plate, the second side plate and the top surface of the second side plate are seamlessly fixed, and second connecting plates are vertically arranged on the two sides of the second side plate; the first connecting plate and the second connecting plate are connected through a tensioning bolt. The method is suitable for different offset pile foundations, materials are saved, and actual construction is facilitated.
本发明公开了一种基于装配式高桩码头桩基的组合式底模及码头施工方法,包括第一分片和第二分片;所述第一分片包括第一侧板和第一顶板,所述第一侧板为半圆形弧面结构,所述第一侧板为半圆环形结构,所述第一侧板的内环直径与所述第一侧板顶面的直径相同并无缝固定,所述第一侧板的两侧垂直设置有第一连接板;所述第二分片包括第二侧板和第二顶板,所述第二侧板为半圆形弧面结构,所述第二侧板为半圆环形结构,所述第二侧板的内环直径与所述第二侧板顶面的直径相同并无缝固定,所述第二侧板的两侧垂直设置有第二连接板;所述第一连接板与第二连接板通过张紧螺栓连接。本发明适应于不同偏位桩基,即节省材料,又利于实际施工。
Combined bottom die based on fabricated high-pile wharf pile foundation and wharf construction method
一种基于装配式高桩码头桩基的组合式底模及码头施工方法
WANG LIUYANG (Autor:in) / GE RUICHEN (Autor:in) / ZHANG GUANGWEI (Autor:in) / FANG JINCAN (Autor:in) / ZHENG LONG (Autor:in) / GU DANPING (Autor:in) / ZHOU JIE (Autor:in) / XU LIUYU (Autor:in) / SHAN YIFAN (Autor:in) / LUAN TING (Autor:in)
25.10.2024
Patent
Elektronische Ressource
Chinesisch
Pile foundation wharf and construction method thereof
Europäisches Patentamt | 2023
|Hammering-resistant wharf combined pile foundation structure
Europäisches Patentamt | 2023
|Fabricated wharf precast pile core bottom plugging device and construction method
Europäisches Patentamt | 2023
|