Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge deck pavement surface layer structure and maintenance construction method
The invention discloses a bridge deck pavement surface layer structure and a maintenance construction method. The structure comprises a bridge deck concrete pavement layer and is characterized in that the bridge deck concrete pavement layer is coated with a bond waterproof layer with ester adhesives as primer, and a colloidal concrete pavement layer formed by blending a curing agent, polyurethane and aggregate is laid on the bond waterproof layer; and an anti-sliding layer is arranged on the colloidal concrete pavement layer. The structure has the beneficial effects that good integrality and waterproofness are achieved, it is ensured that a whole bridge deck is waterproof and free of water seepage, and therefore the waterproof effect is achieved; the good high-temperature-resisting performance is achieved; high wear resistance is achieved, and wear resistance of the structure is ten times that of common cement concrete; and good pressure resistance and the good bending resistance strength are achieved, the repeated effect of loads of a high-flow vehicle can be resisted, and it is ensured that the bridge deck is free of damage to grooves, cracks and the like. According to the construction method, the requirement for the construction environment condition is not high, no special construction tool is needed, no strict technological requirement is needed, and the engineering cost is relatively low.
Bridge deck pavement surface layer structure and maintenance construction method
The invention discloses a bridge deck pavement surface layer structure and a maintenance construction method. The structure comprises a bridge deck concrete pavement layer and is characterized in that the bridge deck concrete pavement layer is coated with a bond waterproof layer with ester adhesives as primer, and a colloidal concrete pavement layer formed by blending a curing agent, polyurethane and aggregate is laid on the bond waterproof layer; and an anti-sliding layer is arranged on the colloidal concrete pavement layer. The structure has the beneficial effects that good integrality and waterproofness are achieved, it is ensured that a whole bridge deck is waterproof and free of water seepage, and therefore the waterproof effect is achieved; the good high-temperature-resisting performance is achieved; high wear resistance is achieved, and wear resistance of the structure is ten times that of common cement concrete; and good pressure resistance and the good bending resistance strength are achieved, the repeated effect of loads of a high-flow vehicle can be resisted, and it is ensured that the bridge deck is free of damage to grooves, cracks and the like. According to the construction method, the requirement for the construction environment condition is not high, no special construction tool is needed, no strict technological requirement is needed, and the engineering cost is relatively low.
Bridge deck pavement surface layer structure and maintenance construction method
XU SU (Autor:in) / HU FENG (Autor:in) / ZHANG HONGBO (Autor:in) / WU WENHAO (Autor:in) / TAN LEILEI (Autor:in) / YANG WU (Autor:in) / CHENG WEI (Autor:in)
02.12.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Hollow slab girder bridge deck pavement structure and maintenance construction method thereof
Europäisches Patentamt | 2022
|Method for replacing bridge deck pavement and bridge deck pavement structure thereof
Europäisches Patentamt | 2020
|Antiskid wearing layer for steel bridge deck pavement and maintenance method
Europäisches Patentamt | 2020
|