Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of well lid of road surface inspection well and auxiliary installation device
The invention discloses a construction method of a well lid of a road surface inspection well. The construction method overcomes the defects that in the prior art, time for installation work of a well lid base is long, and the consistency of construction quality cannot be guaranteed. The construction method of the well lid of the road surface inspection well comprises the following steps that A, a concrete well ring and a well lid base are integrally prefabricated; B, a well ring foundation pit is dug; C, a well mouth supporting inner formwork is mounted in the well mouth of the inspection well; D, the space between the well mouth supporting inner formwork and the well ring foundation pit is filled with concrete; E, the concrete well ring and the well lid base are hoisted integrally; F, the well ring foundation pit and the prefabricated concrete well ring are filled with concrete, and the concrete is compacted; G, the well mouth supporting inner formwork and a hoisting and leveling device are taken out; and H, an asphalt concrete pavement layer between the well ring and the road surface is laid. The invention further provides an auxiliary installation device. The auxiliary installation device comprises the well mouth supporting inner formwork and the hoisting and leveling device. According to the construction method of the well lid of the road surface inspection well and the auxiliary installation device, construction is simple, work time is short, the dimensional precision of well lid installation is high, and the construction method and the auxiliary installation device are suitable for well lid installation.
Construction method of well lid of road surface inspection well and auxiliary installation device
The invention discloses a construction method of a well lid of a road surface inspection well. The construction method overcomes the defects that in the prior art, time for installation work of a well lid base is long, and the consistency of construction quality cannot be guaranteed. The construction method of the well lid of the road surface inspection well comprises the following steps that A, a concrete well ring and a well lid base are integrally prefabricated; B, a well ring foundation pit is dug; C, a well mouth supporting inner formwork is mounted in the well mouth of the inspection well; D, the space between the well mouth supporting inner formwork and the well ring foundation pit is filled with concrete; E, the concrete well ring and the well lid base are hoisted integrally; F, the well ring foundation pit and the prefabricated concrete well ring are filled with concrete, and the concrete is compacted; G, the well mouth supporting inner formwork and a hoisting and leveling device are taken out; and H, an asphalt concrete pavement layer between the well ring and the road surface is laid. The invention further provides an auxiliary installation device. The auxiliary installation device comprises the well mouth supporting inner formwork and the hoisting and leveling device. According to the construction method of the well lid of the road surface inspection well and the auxiliary installation device, construction is simple, work time is short, the dimensional precision of well lid installation is high, and the construction method and the auxiliary installation device are suitable for well lid installation.
Construction method of well lid of road surface inspection well and auxiliary installation device
LUO SI ( Autor:in ) / WU XIAODAN ( Autor:in ) / MU DANING ( Autor:in ) / SUN LONG ( Autor:in ) / WANG RUHENG ( Autor:in ) / XING QIZHI ( Autor:in )
09.12.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Road edge stone installation and construction method avoiding inspection well
Europäisches Patentamt | 2015
|Municipal road inspection well structure and installation and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Repairing construction method of road inspection well
Europäisches Patentamt | 2020
|