Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of underground continuous wall below viaduct
The invention relates to a construction method of an underground continuous wall below a viaduct. The method specifically includes the first step of staking out in a survey, the second step of guiding wall manufacturing, the third step of width adjustment of the underground continuous wall, the fourth step of slurry preparation, the fifth step of grooving construction, the sixth step of reinforcement cage manufacturing, hoisting and releasing, the seventh step of concrete grouting, the eighth step of repeatedly executing the fifth step, the sixth step and the seventh step till construction of a to-be-formed single-width undergrou nd continuous wall construction unit ends, and the ninth step of underground continuous wall joint processing. By means of the construction method, construction of the underground continuous wall can be fast completed while the quality and the quantity are guaranteed, and a viaduct pier will not be affected. Compared with a cast-in-situ bored pile construction method, the construction method has the beneficial effects that construction speed is high in the construction progress, stratum disturbance is small, and therefore the influences on the viaduct pier are small.
Construction method of underground continuous wall below viaduct
The invention relates to a construction method of an underground continuous wall below a viaduct. The method specifically includes the first step of staking out in a survey, the second step of guiding wall manufacturing, the third step of width adjustment of the underground continuous wall, the fourth step of slurry preparation, the fifth step of grooving construction, the sixth step of reinforcement cage manufacturing, hoisting and releasing, the seventh step of concrete grouting, the eighth step of repeatedly executing the fifth step, the sixth step and the seventh step till construction of a to-be-formed single-width undergrou nd continuous wall construction unit ends, and the ninth step of underground continuous wall joint processing. By means of the construction method, construction of the underground continuous wall can be fast completed while the quality and the quantity are guaranteed, and a viaduct pier will not be affected. Compared with a cast-in-situ bored pile construction method, the construction method has the beneficial effects that construction speed is high in the construction progress, stratum disturbance is small, and therefore the influences on the viaduct pier are small.
Construction method of underground continuous wall below viaduct
LIU HUI (Autor:in) / LIU GUANGPEI (Autor:in) / SUN ZHENCHUAN (Autor:in) / YE KANGKAI (Autor:in) / CHEN LIBO (Autor:in) / YANG WUJI (Autor:in) / MA BIN (Autor:in)
23.12.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
VIADUCT CONSTRUCTION METHOD AND VIADUCT CONSTRUCTION DEVICE
Europäisches Patentamt | 2021
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL, AND UNDERGROUND CONTINUOUS WALL
Europäisches Patentamt | 2017
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL AND UNDERGROUND CONTINUOUS WALL
Europäisches Patentamt | 2017
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL AND UNDERGROUND CONTINUOUS WALL
Europäisches Patentamt | 2018
|UNDERGROUND CONTINUOUS WALL AND CONSTRUCTION METHOD FOR UNDERGROUND CONTINUOUS WALL
Europäisches Patentamt | 2020
|