Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Jack for steel truss girder upper chord member installation and steel truss girder upper chord member installation process
The invention discloses a jack for steel truss girder upper chord member installation. The jack comprises a jack body. A connection plate is fixedly arranged on the bottom of the jack body and provided with two or more through holes matched with splice plate holes in a diagonal to be installed. A supporting part is arranged at the end of an ejection rod of the jack body. In use, the jack is installed on the steel truss diagonal in advance, the distance between rod members is set through the jack in advance, the jack carries out fine adjustment when chord members are hoisted, hole alignment is convenient, installation is easy and convenient, and the upper chord members can be installed fast. The invention further provides a steel truss girder upper chord member installation process. According to the process, the upper chord members can be installed fast, stress on the diagonal can be reduced, the weight is not increased in the installation process of the upper chord members, the high altitude operation time of workers is shortened in the installation process of the upper chord members, the risk of the workers is also lowered in the installation process of the upper chord members, and the assembly speed of the rod members is increased.
Jack for steel truss girder upper chord member installation and steel truss girder upper chord member installation process
The invention discloses a jack for steel truss girder upper chord member installation. The jack comprises a jack body. A connection plate is fixedly arranged on the bottom of the jack body and provided with two or more through holes matched with splice plate holes in a diagonal to be installed. A supporting part is arranged at the end of an ejection rod of the jack body. In use, the jack is installed on the steel truss diagonal in advance, the distance between rod members is set through the jack in advance, the jack carries out fine adjustment when chord members are hoisted, hole alignment is convenient, installation is easy and convenient, and the upper chord members can be installed fast. The invention further provides a steel truss girder upper chord member installation process. According to the process, the upper chord members can be installed fast, stress on the diagonal can be reduced, the weight is not increased in the installation process of the upper chord members, the high altitude operation time of workers is shortened in the installation process of the upper chord members, the risk of the workers is also lowered in the installation process of the upper chord members, and the assembly speed of the rod members is increased.
Jack for steel truss girder upper chord member installation and steel truss girder upper chord member installation process
YANG CHAO (Autor:in) / ZHOU HONGSHUN (Autor:in) / WANG YONGQIANG (Autor:in) / LI WEI (Autor:in) / YANG WENLIANG (Autor:in) / WANG XIGANG (Autor:in) / WANG HAIZHOU (Autor:in) / GUO ZHIQI (Autor:in)
23.12.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2024
|Curve stiffening chord steel truss girder bridge design method and steel truss girder bridge
Europäisches Patentamt | 2024
|Steel truss girder chord member and web member connecting structure and construction method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Deck Having Truss Girder with stiffened top-chord of formed steel section
Europäisches Patentamt | 2018
|