Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for reserved shield crossing composite foundation pit support device
The invention discloses a construction method for a reserved shield crossing composite foundation pit support device. The method comprises the steps of 1 construction preparing, wherein the construction site situation and the engineering geology and hydrogeololgy situations are investigated and researched; 2 underground diaphragm wall constructing; 3 three-axis mixing pile wall forming constructing outside an underground diaphragm wall by means of an SMW construction method; 4 profile steel installing; 5 high-pressure jet grouting pile filling; 6 top beam manufacturing; 7 construction monitoring, foundation pit excavating and structure constructing; 8 profile steel removing; 9 back filling grouting.
Construction method for reserved shield crossing composite foundation pit support device
The invention discloses a construction method for a reserved shield crossing composite foundation pit support device. The method comprises the steps of 1 construction preparing, wherein the construction site situation and the engineering geology and hydrogeololgy situations are investigated and researched; 2 underground diaphragm wall constructing; 3 three-axis mixing pile wall forming constructing outside an underground diaphragm wall by means of an SMW construction method; 4 profile steel installing; 5 high-pressure jet grouting pile filling; 6 top beam manufacturing; 7 construction monitoring, foundation pit excavating and structure constructing; 8 profile steel removing; 9 back filling grouting.
Construction method for reserved shield crossing composite foundation pit support device
LOU DAI (Autor:in) / XU WENMING (Autor:in) / XU LEYONG (Autor:in) / HU BAOJIE (Autor:in) / PAN LINBIN (Autor:in) / CAO LEI (Autor:in) / FU JUN (Autor:in)
30.12.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2015
|Construction device and construction method for reserved bolt hole of equipment foundation
Europäisches Patentamt | 2024
|Construction method for reserved hole of equipment foundation bolt
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2023
|Construction method of river-crossing foundation pit support
Europäisches Patentamt | 2022
|