Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Top strut used for assembling container house
The invention discloses a top strut used for assembling a container house. The top strut comprises a strip-type top strut body. The top strut body comprises a first ejector rod, a second ejector rod and a third ejector rod, wherein the second ejector rod and the third ejector rod are connected with the first ejector rod, the section of the first ejector rod, the section of the second ejector rod and the section of the third ejector rod are all in an L shape, one side of the second ejector rod is perpendicularly connected with one lateral side of the first ejector rod, the other side of the second ejector rod is turned over towards the outside of the first ejector rod so as to form a carrying platform, one side of the third ejector rod is perpendicularly connected with the other lateral side of the first ejector rod, and the other side of the third ejector rod is turned back towards the inside of the first ejector rod. By the adoption of the top strut used for assembling the container house, the tops of wallboards can be well spliced and fixed; meanwhile, the protruding platform used for carrying a roof is also formed and can stably bear the weight of the roof, so that the stability and strength are high.
Top strut used for assembling container house
The invention discloses a top strut used for assembling a container house. The top strut comprises a strip-type top strut body. The top strut body comprises a first ejector rod, a second ejector rod and a third ejector rod, wherein the second ejector rod and the third ejector rod are connected with the first ejector rod, the section of the first ejector rod, the section of the second ejector rod and the section of the third ejector rod are all in an L shape, one side of the second ejector rod is perpendicularly connected with one lateral side of the first ejector rod, the other side of the second ejector rod is turned over towards the outside of the first ejector rod so as to form a carrying platform, one side of the third ejector rod is perpendicularly connected with the other lateral side of the first ejector rod, and the other side of the third ejector rod is turned back towards the inside of the first ejector rod. By the adoption of the top strut used for assembling the container house, the tops of wallboards can be well spliced and fixed; meanwhile, the protruding platform used for carrying a roof is also formed and can stably bear the weight of the roof, so that the stability and strength are high.
Top strut used for assembling container house
GE TINGHONG (Autor:in)
30.12.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
CONTAINER HOUSE, PANEL FOR CONTAINER HOUSE, AND ASSEMBLING METHOD OF CONTAINER HOUSE
Europäisches Patentamt | 2020
|Movable container house steel framework and assembling method thereof
Europäisches Patentamt | 2022
|