Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Combined assembling structure of container house
A combined assembling structure of a container house relates to the technical field of buildings and comprises a base, three edges of the base are provided with sliding grooves, a plurality of guide wheels are arranged in the sliding grooves, a first wallboard is connected with a second wallboard and a third wallboard and slidably mounted in the sliding grooves, and cylinders are mounted at the top ends and the middle lower ends of the outer sides of the first wallboard and the third wallboard. The door frame is installed on the fourth edge of the base through air cylinders on the first wall plate and the third wall plate, fixing rods are welded to the upper ends of the first wall plate, the second wall plate, the third wall plate and the door frame, fixing grooves are formed in the inner side of the drainage top, and the fixing rods of the first wall plate, the second wall plate, the third wall plate and the door frame are installed in the fixing grooves of the drainage top. The wallboard I, the wallboard II and the wallboard III are connected, and the door frame is fixed in cooperation with the air cylinder, so that the problem that during splicing, multiple persons need to cooperate, and screws are used for fixing is solved. Meanwhile, the drainage top is installed through the fixing rod, the installation efficiency is improved, and the labor intensity is relieved.
一种集装箱房组合拼装结构,涉及建筑技术领域,包括底座,底座的三个边上均设置有滑槽,滑槽内设置有若干个导向轮,墙板一连接墙板二和墙板三滑动安装在滑槽内上,墙板一和墙体三的一外侧顶端和中下端均安装有气缸,通过墙板一和墙板三上的气缸将门框架安装在底座的第四条边上,墙板一、墙板二、墙板三和门框架的上端均焊接有固定杆,疏水顶的内侧设置有固定槽,墙板一、墙板二、墙板三和门框架的固定杆安装在疏水顶的固定槽内。本发明通过墙板一、墙板二和墙板三连接,再配合气缸将门框架固定,解决了拼装时需要多人配合,用螺丝进行固定的问题。同时通过固定杆安装疏水顶,提高了安装效率,减轻了劳动强度。
Combined assembling structure of container house
A combined assembling structure of a container house relates to the technical field of buildings and comprises a base, three edges of the base are provided with sliding grooves, a plurality of guide wheels are arranged in the sliding grooves, a first wallboard is connected with a second wallboard and a third wallboard and slidably mounted in the sliding grooves, and cylinders are mounted at the top ends and the middle lower ends of the outer sides of the first wallboard and the third wallboard. The door frame is installed on the fourth edge of the base through air cylinders on the first wall plate and the third wall plate, fixing rods are welded to the upper ends of the first wall plate, the second wall plate, the third wall plate and the door frame, fixing grooves are formed in the inner side of the drainage top, and the fixing rods of the first wall plate, the second wall plate, the third wall plate and the door frame are installed in the fixing grooves of the drainage top. The wallboard I, the wallboard II and the wallboard III are connected, and the door frame is fixed in cooperation with the air cylinder, so that the problem that during splicing, multiple persons need to cooperate, and screws are used for fixing is solved. Meanwhile, the drainage top is installed through the fixing rod, the installation efficiency is improved, and the labor intensity is relieved.
一种集装箱房组合拼装结构,涉及建筑技术领域,包括底座,底座的三个边上均设置有滑槽,滑槽内设置有若干个导向轮,墙板一连接墙板二和墙板三滑动安装在滑槽内上,墙板一和墙体三的一外侧顶端和中下端均安装有气缸,通过墙板一和墙板三上的气缸将门框架安装在底座的第四条边上,墙板一、墙板二、墙板三和门框架的上端均焊接有固定杆,疏水顶的内侧设置有固定槽,墙板一、墙板二、墙板三和门框架的固定杆安装在疏水顶的固定槽内。本发明通过墙板一、墙板二和墙板三连接,再配合气缸将门框架固定,解决了拼装时需要多人配合,用螺丝进行固定的问题。同时通过固定杆安装疏水顶,提高了安装效率,减轻了劳动强度。
Combined assembling structure of container house
一种集装箱房组合拼装结构
CHU YUHONG (Autor:in)
24.06.2022
Patent
Elektronische Ressource
Chinesisch
CONTAINER HOUSE, PANEL FOR CONTAINER HOUSE, AND ASSEMBLING METHOD OF CONTAINER HOUSE
Europäisches Patentamt | 2020
|