Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Integrative construction device and method for pile cap and pile body of pouring pile
The invention relates to an integrative construction device for a pile cap and a pile body of a pouring pile. The integrative construction device comprises a level gauge, a total station and a base plate with an annular cross section. The annular base plate is laid around an upper end opening of a pile hole and connected to an overall reinforcement cage in a sleeving manner. The overall reinforcement cage is arranged in the pile hole. The pile hole and the overall reinforcement cage coaxially coincide. The overall reinforcement cage is divided into a ground pile cap steel bar part and a pile foundation underground steel bar part. The overall reinforcement cage comprises a set of longitudinally-arranged main bars and a spiral stirrup surrounding the main bars. A set of groove holes is formed in the annular base plate, and bolts matched with the groove holes are arranged. The bolts are connected with bolt holes in a formwork in a matched manner. The formwork coincides with the base plate and the center of the overall reinforcement cage. The integrative construction device is low in construction difficulty and has high economic benefits and social environment benefits.
Integrative construction device and method for pile cap and pile body of pouring pile
The invention relates to an integrative construction device for a pile cap and a pile body of a pouring pile. The integrative construction device comprises a level gauge, a total station and a base plate with an annular cross section. The annular base plate is laid around an upper end opening of a pile hole and connected to an overall reinforcement cage in a sleeving manner. The overall reinforcement cage is arranged in the pile hole. The pile hole and the overall reinforcement cage coaxially coincide. The overall reinforcement cage is divided into a ground pile cap steel bar part and a pile foundation underground steel bar part. The overall reinforcement cage comprises a set of longitudinally-arranged main bars and a spiral stirrup surrounding the main bars. A set of groove holes is formed in the annular base plate, and bolts matched with the groove holes are arranged. The bolts are connected with bolt holes in a formwork in a matched manner. The formwork coincides with the base plate and the center of the overall reinforcement cage. The integrative construction device is low in construction difficulty and has high economic benefits and social environment benefits.
Integrative construction device and method for pile cap and pile body of pouring pile
CHEN YAJUN (Autor:in) / SHI JINXUE (Autor:in) / DU YI (Autor:in)
03.02.2016
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile pouring structure, pile structure and pile head demolition method
Europäisches Patentamt | 2020
|