Construction method for quicksand layer pile foundation
The invention discloses a construction method for a quicksand layer pile foundation. The construction method comprises the following steps that S10 the depth of a quicksand layer around the pile portion is surveyed, the length of the quicksand layer capable of penetrating through a steel pile casing is determined according to the survey result, and the steel pile casing is prefabricated; S20 the whole steel pile casing is embedded in the pile portion with the adoption of a vibratory hammer; S30 a pore is drilled and formed in the steel pile casing, a reinforcement cage is installed in a pore after the pore is formed, and the reinforcement cage is positioned on the pore opening after the reinforcement cage is installed; and S40 a conduit is installed and fixed in the pore, concrete is injected into the pore through the conduit after the pore is cleaned up, the steel pile casing is lifted immediately after the concrete is injected to the top face of the steel pile casing, the lifting time of the steel pile casing is controlled in the initial set time of the concrete, and the concrete sets and forms the pile foundation after the steel pile casing is lifted out totally. According to the construction method for the quicksand layer pile foundation, the quicksand layer pile pore can be prevented from collapsing effectively, and sand layer loss and the exceeding square amount of the concrete in the pore are controlled well, so that the use amount of the concrete is reduced, mud treatment and discharging are decreased, the mud is prevented from polluting the environment, the construction cost is reduced, the construction period is short, and the benefit is high.
Construction method for quicksand layer pile foundation
The invention discloses a construction method for a quicksand layer pile foundation. The construction method comprises the following steps that S10 the depth of a quicksand layer around the pile portion is surveyed, the length of the quicksand layer capable of penetrating through a steel pile casing is determined according to the survey result, and the steel pile casing is prefabricated; S20 the whole steel pile casing is embedded in the pile portion with the adoption of a vibratory hammer; S30 a pore is drilled and formed in the steel pile casing, a reinforcement cage is installed in a pore after the pore is formed, and the reinforcement cage is positioned on the pore opening after the reinforcement cage is installed; and S40 a conduit is installed and fixed in the pore, concrete is injected into the pore through the conduit after the pore is cleaned up, the steel pile casing is lifted immediately after the concrete is injected to the top face of the steel pile casing, the lifting time of the steel pile casing is controlled in the initial set time of the concrete, and the concrete sets and forms the pile foundation after the steel pile casing is lifted out totally. According to the construction method for the quicksand layer pile foundation, the quicksand layer pile pore can be prevented from collapsing effectively, and sand layer loss and the exceeding square amount of the concrete in the pore are controlled well, so that the use amount of the concrete is reduced, mud treatment and discharging are decreased, the mud is prevented from polluting the environment, the construction cost is reduced, the construction period is short, and the benefit is high.
Construction method for quicksand layer pile foundation
ZOU XIAOWEI (Autor:in) / ZHOU HONGYU (Autor:in) / LI JIAHONG (Autor:in) / LEI ZHIHUI (Autor:in) / HE DUIXI (Autor:in) / LUO HAO (Autor:in)
03.02.2016
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile sinking construction method for quicksand stratum pile foundation of onshore wind power plant
Europäisches Patentamt | 2023
|High-water-level quicksand ground lateral stress pile foundation and construction method
Europäisches Patentamt | 2024
|Pile hole construction method for slide-resistant pile penetrating through quicksand layer
Europäisches Patentamt | 2021
|A steel pile foundation in a quicksand pocket
Engineering Index Backfile | 1908
Construction method for foundation pit in raft of quicksand layer water-rich foundation
Europäisches Patentamt | 2023
|