Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Elevator shaft construction method and used device
The invention discloses an elevator shaft construction method and a used device. The method comprises the steps of first constructing a bottom layer elevator shaft according to a conventional elevator shaft construction process; during the pouring of the bottom layer elevator shaft, reserving supporting holes in the shaft wall of the elevator shaft; during the upper layer elevator shaft construction, utilizing the supporting holes to build an operating platform; causing constructors to finish construction of the upper layer elevator shaft on the operating platform; during the upper layer elevator shaft construction, reserving supporting holes in the shaft wall of the upper layer elevator shaft, and then lifting the operating platform upwards through a tower crane and supporting the operating platform in the supporting holes of the upper layer elevator shaft wall; doing the rest in the same manner, and finishing elevator shaft construction layer by layer from bottom to top. The lifting process is short, and the lifting for each time only needs 5-8 min. The construction progress is accelerated, and the construction effect is improved. The elevator shaft is formed by splicing bolts, can be transferred for use and is low in amortization cost. The elevator shaft is simple to operate, convenient and swift. A supporting beam is in telescopic design and can be suitable for the requirements of elevator shafts of different sizes.
Elevator shaft construction method and used device
The invention discloses an elevator shaft construction method and a used device. The method comprises the steps of first constructing a bottom layer elevator shaft according to a conventional elevator shaft construction process; during the pouring of the bottom layer elevator shaft, reserving supporting holes in the shaft wall of the elevator shaft; during the upper layer elevator shaft construction, utilizing the supporting holes to build an operating platform; causing constructors to finish construction of the upper layer elevator shaft on the operating platform; during the upper layer elevator shaft construction, reserving supporting holes in the shaft wall of the upper layer elevator shaft, and then lifting the operating platform upwards through a tower crane and supporting the operating platform in the supporting holes of the upper layer elevator shaft wall; doing the rest in the same manner, and finishing elevator shaft construction layer by layer from bottom to top. The lifting process is short, and the lifting for each time only needs 5-8 min. The construction progress is accelerated, and the construction effect is improved. The elevator shaft is formed by splicing bolts, can be transferred for use and is low in amortization cost. The elevator shaft is simple to operate, convenient and swift. A supporting beam is in telescopic design and can be suitable for the requirements of elevator shafts of different sizes.
Elevator shaft construction method and used device
MA GUOPEI (Autor:in) / WU NENGMIAO (Autor:in) / XIE CHAO (Autor:in) / WU JIE (Autor:in) / WU XINXING (Autor:in) / PENG SHAOYONG (Autor:in) / LI ZONG (Autor:in) / XIAO KANG (Autor:in) / QIN KAI (Autor:in) / OUYANG CONG (Autor:in)
10.02.2016
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Elevator shaft prefabricated frame and elevator shaft construction method
Europäisches Patentamt | 2022
|Elevator shaft construction device and construction method
Europäisches Patentamt | 2024
|Elevator shaft construction device and construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Elevator shaft construction platform device and construction method
Europäisches Patentamt | 2024
|