Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High arch dam construction diversion tunnel structure and design method thereof
The invention belongs to the technical field of water resources and hydropower engineering, and discloses a high arch dam construction diversion tunnel structure and a design method thereof. With the adoption of the high arch dam construction diversion tunnel structure and the design method of the high arch dam construction diversion tunnel structure, diversion tunnels can be used for transportation in a non-flood season; through reasonable arrangement of the high diversion tunnel and the low diversion tunnel, particularly the arrangement of the size of the low diversion tunnel, in the non-flood season, the river diversion requirement can be met simply through the low diversion tunnel, the high diversion tunnel can be communicated with transportation roads corresponding to an inlet end and an outlet end, then transportation is realized through the high diversion tunnel, thereby realizing the one-diversion tunnel multifunctional purpose. In a flood season, when the low diversion tunnel can not meet the flood diversion requirement, the high diversion tunnel can assist in performing river diversion, and the flood protection requirement is met. The safety of sluice releasing and blocking on the diversion tunnels in the later stage can be improved, and the requirements of different power generation construction periods can be met.
High arch dam construction diversion tunnel structure and design method thereof
The invention belongs to the technical field of water resources and hydropower engineering, and discloses a high arch dam construction diversion tunnel structure and a design method thereof. With the adoption of the high arch dam construction diversion tunnel structure and the design method of the high arch dam construction diversion tunnel structure, diversion tunnels can be used for transportation in a non-flood season; through reasonable arrangement of the high diversion tunnel and the low diversion tunnel, particularly the arrangement of the size of the low diversion tunnel, in the non-flood season, the river diversion requirement can be met simply through the low diversion tunnel, the high diversion tunnel can be communicated with transportation roads corresponding to an inlet end and an outlet end, then transportation is realized through the high diversion tunnel, thereby realizing the one-diversion tunnel multifunctional purpose. In a flood season, when the low diversion tunnel can not meet the flood diversion requirement, the high diversion tunnel can assist in performing river diversion, and the flood protection requirement is met. The safety of sluice releasing and blocking on the diversion tunnels in the later stage can be improved, and the requirements of different power generation construction periods can be met.
High arch dam construction diversion tunnel structure and design method thereof
ZHANG CHAO (Autor:in) / WANG YONGGANG (Autor:in) / FU ZHENG (Autor:in) / LEI YUNHUA (Autor:in) / ZHANG YOUSHAN (Autor:in)
17.02.2016
Patent
Elektronische Ressource
Englisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Diversion tunnel and construction arrangement method of diversion tunnel
Europäisches Patentamt | 2023
|Diversion tunnel anti-dislocation structure and construction method thereof
Europäisches Patentamt | 2023
|Construction of Maraetai diversion tunnel
Engineering Index Backfile | 1950
|