The invention discloses a construction method suitable for an emery structural ground of a large factory building. The construction method comprises the following steps: S1) the preparatory work before construction is finished; S2) the surveying and the positioning are performed on a concrete cushion layer of a bearing platform; multiple U-shaped long reinforcements are arranged in the bearing platform; and the template supporting and the reinforcement treatment are performed on a positioning sideline of the bearing platform; S3) after the template supporting is finished, the concrete casting of the bearing platform and the concrete casting of a structural baseplate cushion layer are performed; S4) a ground upper structure formwork system and a factory building main structure are constructed; and S5) the deburring and the cleaning are performed for the bearing platform; the baseplate reinforcement binding of a two-layer and two-direction structure of an emery structural baseplate is performed; and finally, the casting of concrete at the upper part of the bearing platform and a once-molded emery structural ground is finished. The construction method not only can guarantee the structure strength and quality of the bearing platform, but also can largely shorten the construction period, can guarantee the surface of the bearing platform to be not damaged by later construction, and reduces the management cost and the operation cost.
Construction method suitable for emery structural ground of large factory building
The invention discloses a construction method suitable for an emery structural ground of a large factory building. The construction method comprises the following steps: S1) the preparatory work before construction is finished; S2) the surveying and the positioning are performed on a concrete cushion layer of a bearing platform; multiple U-shaped long reinforcements are arranged in the bearing platform; and the template supporting and the reinforcement treatment are performed on a positioning sideline of the bearing platform; S3) after the template supporting is finished, the concrete casting of the bearing platform and the concrete casting of a structural baseplate cushion layer are performed; S4) a ground upper structure formwork system and a factory building main structure are constructed; and S5) the deburring and the cleaning are performed for the bearing platform; the baseplate reinforcement binding of a two-layer and two-direction structure of an emery structural baseplate is performed; and finally, the casting of concrete at the upper part of the bearing platform and a once-molded emery structural ground is finished. The construction method not only can guarantee the structure strength and quality of the bearing platform, but also can largely shorten the construction period, can guarantee the surface of the bearing platform to be not damaged by later construction, and reduces the management cost and the operation cost.
Construction method suitable for emery structural ground of large factory building
WU QUNSHAN (Autor:in) / YIN DIAN (Autor:in) / YAN FENG (Autor:in) / YANG DUOJIAO (Autor:in) / MENG SHIHAO (Autor:in)
24.02.2016
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
High-precision hollowing-free emery ground construction process
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Hollow and micropore repair construction method of wear-resisting emery ground
Europäisches Patentamt | 2020
|Construction device for building workshop emery floor and using method thereof
Europäisches Patentamt | 2021
|