Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shear wall construction process based on fully prefabricated floor slab
The invention discloses a shear wall construction process based on a fully prefabricated floor slab. The shear wall construction process comprises the following steps: (1) binding shear wall steel bars at the bottom layer after the construction of a standard layer is finished; (2) respectively installing a shear wall inner template and a shear wall outer template on two sides of the shear wall steel bars; (3) pouring concrete; (4) installing a supporting system of the prefabricated floor slab; (5) hoisting the prefabricated floor slab close to one end of a shear wall to serve as a constructionplatform; (6) dismantling the shear wall inner template and the shear wall outer template to lift the shear wall inner template and the shear wall outer template to the construction platform; (7) hoisting prefabricated floor slabs which are not installed in the step (5); (8) binding shear wall steel bars, beam steel bars, column steel bars and floor steel bars on the upper layer; (9) respectivelyinstalling a shear wall inner template and a shear wall outer template on two sides of the shear wall steel bars; (10) pouring concrete; and (11) repeating the steps (4) to (10) to finish the shear wall construction layer by layer. The process can reduce the difficulty of cross-layer transportation of a shear wall template system and reduce the construction cost.
本发明公开了基于全预制楼板的剪力墙施工工艺包括以下步骤:(1)标准层施工完成后进行底层的剪力墙钢筋的绑扎;(2)在剪力墙钢筋的两侧分别安装剪力墙内模板和剪力墙外模板;(3)浇筑混凝土;(4)安装预制楼板的支撑体系;(5)吊装靠近剪力墙一端的预制楼板以作为施工平台;(6)拆除剪力墙内模板和剪力墙外模板将其吊运至施工平台;(7)吊装步骤(5)未安装的预制楼板;(8)绑扎上层的剪力墙钢筋、梁钢筋、柱钢筋和楼板钢筋;(9)在剪力墙钢筋的两侧分别安装剪力墙内模板和剪力墙外模板;(10)浇筑混凝土;(11)重复步骤(4)至步骤(10)以逐层完成剪力墙施工。该工艺可减小剪力墙模板系统跨层运输的难度,降低施工成本。
Shear wall construction process based on fully prefabricated floor slab
The invention discloses a shear wall construction process based on a fully prefabricated floor slab. The shear wall construction process comprises the following steps: (1) binding shear wall steel bars at the bottom layer after the construction of a standard layer is finished; (2) respectively installing a shear wall inner template and a shear wall outer template on two sides of the shear wall steel bars; (3) pouring concrete; (4) installing a supporting system of the prefabricated floor slab; (5) hoisting the prefabricated floor slab close to one end of a shear wall to serve as a constructionplatform; (6) dismantling the shear wall inner template and the shear wall outer template to lift the shear wall inner template and the shear wall outer template to the construction platform; (7) hoisting prefabricated floor slabs which are not installed in the step (5); (8) binding shear wall steel bars, beam steel bars, column steel bars and floor steel bars on the upper layer; (9) respectivelyinstalling a shear wall inner template and a shear wall outer template on two sides of the shear wall steel bars; (10) pouring concrete; and (11) repeating the steps (4) to (10) to finish the shear wall construction layer by layer. The process can reduce the difficulty of cross-layer transportation of a shear wall template system and reduce the construction cost.
本发明公开了基于全预制楼板的剪力墙施工工艺包括以下步骤:(1)标准层施工完成后进行底层的剪力墙钢筋的绑扎;(2)在剪力墙钢筋的两侧分别安装剪力墙内模板和剪力墙外模板;(3)浇筑混凝土;(4)安装预制楼板的支撑体系;(5)吊装靠近剪力墙一端的预制楼板以作为施工平台;(6)拆除剪力墙内模板和剪力墙外模板将其吊运至施工平台;(7)吊装步骤(5)未安装的预制楼板;(8)绑扎上层的剪力墙钢筋、梁钢筋、柱钢筋和楼板钢筋;(9)在剪力墙钢筋的两侧分别安装剪力墙内模板和剪力墙外模板;(10)浇筑混凝土;(11)重复步骤(4)至步骤(10)以逐层完成剪力墙施工。该工艺可减小剪力墙模板系统跨层运输的难度,降低施工成本。
Shear wall construction process based on fully prefabricated floor slab
基于全预制楼板的剪力墙施工工艺
LIU DEJIN (Autor:in) / FENG HAIBAO (Autor:in) / WANG XIANG (Autor:in) / YU CHAO (Autor:in) / FENG JIAXIN (Autor:in) / JU PENG (Autor:in) / FU DAWEI (Autor:in) / WANG MINGYU (Autor:in) / QU LILI (Autor:in) / WANG DI (Autor:in)
10.04.2020
Patent
Elektronische Ressource
Chinesisch
Assembly type fully-prefabricated floor slab and prefabricated shear wall connecting joint
Europäisches Patentamt | 2024
|Prefabricated floor slab-prefabricated shear wall connecting joint and construction method thereof
Europäisches Patentamt | 2021
|Fully-prefabricated floor slab system and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|