Construction process for hollowing prevention of wall surface
A construction process for hollowing prevention of a wall surface includes the following steps of a, interior wall body grinding; b, wall surface treatment; c, interior wall gluing; d, gluing mortar scraping; e, roughening operation; f, puttying; g, coating scraping; h, leakage-proof treatment; i, foaming agent beating; j, wall surface clearing; k, interface mortar daubing; l, thermal insulation mortar preparation; m, watering; n, thermal insulation mortar daubing; and o, maintenance. Roughening operation is carried out by daubing the mortar on the surface of an aerated concrete block, the degree of uniformity of glue daubed on the wall surface is judged by fine sand in the glue in the interior wall gluing process,thus hollowing of the wall surface is prevented, and the requirements of theconstruction industry for environmental protection are met.
一种墙面防空鼓施工工艺包括以下步骤:a.内墙墙体削磨;b.墙面处理;c.内墙涂胶;d.刮抹胶合砂浆;e.拉毛操作;f.刮腻子;g.刮抹涂料;h.防漏处理;i.打发泡剂;j.墙面清理;k.涂抹界面砂浆;l.制备保温砂浆;m.洒水;n.涂抹保温砂浆;o.养护,通过在加气混凝土砌块的表面上涂抹砂浆进行拉毛操作,在内墙涂胶过程中通过胶水中的细砂对涂在墙面的胶水均匀程度进行判断,从而防止墙面空鼓,符合建筑行业对于保的要求。
Construction process for hollowing prevention of wall surface
A construction process for hollowing prevention of a wall surface includes the following steps of a, interior wall body grinding; b, wall surface treatment; c, interior wall gluing; d, gluing mortar scraping; e, roughening operation; f, puttying; g, coating scraping; h, leakage-proof treatment; i, foaming agent beating; j, wall surface clearing; k, interface mortar daubing; l, thermal insulation mortar preparation; m, watering; n, thermal insulation mortar daubing; and o, maintenance. Roughening operation is carried out by daubing the mortar on the surface of an aerated concrete block, the degree of uniformity of glue daubed on the wall surface is judged by fine sand in the glue in the interior wall gluing process,thus hollowing of the wall surface is prevented, and the requirements of theconstruction industry for environmental protection are met.
一种墙面防空鼓施工工艺包括以下步骤:a.内墙墙体削磨;b.墙面处理;c.内墙涂胶;d.刮抹胶合砂浆;e.拉毛操作;f.刮腻子;g.刮抹涂料;h.防漏处理;i.打发泡剂;j.墙面清理;k.涂抹界面砂浆;l.制备保温砂浆;m.洒水;n.涂抹保温砂浆;o.养护,通过在加气混凝土砌块的表面上涂抹砂浆进行拉毛操作,在内墙涂胶过程中通过胶水中的细砂对涂在墙面的胶水均匀程度进行判断,从而防止墙面空鼓,符合建筑行业对于保的要求。
Construction process for hollowing prevention of wall surface
一种墙面防空鼓的施工工艺
LIU CHUANLONG (Autor:in) / XIANG YUANHUA (Autor:in) / CHEN RONG (Autor:in)
10.04.2020
Patent
Elektronische Ressource
Chinesisch
Construction method for preventing hollowing of stone wall surface
Europäisches Patentamt | 2022
|Construction process for preventing hollowing and falling of exterior wall tiles
Europäisches Patentamt | 2021
|Hollowing-prevention cracking-prevention process of concrete floor leveling layer
Europäisches Patentamt | 2020
|