Hollowing-prevention cracking-prevention process of concrete floor leveling layer
The invention provides a hollowing-prevention cracking-prevention process of a concrete floor leveling layer, and belongs to the technical field of concrete construction. The process comprises the following steps of ground milling; warehouse dividing form erecting; steel fiber concrete preparing; steel fiber concrete entering; steel fiber concrete pouring; steel fiber concrete paving by a laser leveling machine; silicon carbide construction and grinding surface press polish; concrete maintaining; seam cutting and filing; and concrete seal curing agent construction. Through the process, the ground is high in levelness, a forklift stably runs, hardness is high, press resistance and bending resistance are best, dust prevention is permanent, cleaning is easy, sliding is prevented, wear resistance is high, high temperature is resisted, and the aim of getting done once and for ever through one-time construction is achieved.
本发明提供了一种混凝土地坪找平层的防空鼓防开裂工艺,属于混凝土施工技术领域,包括如下步骤:铣刨地面;分仓支模;钢纤维混凝土制备;钢纤维混凝土进场;钢纤维混凝土浇注;激光整平机摊铺钢纤维混凝土;金刚砂施工及磨面收光;混凝土养护;切缝填缝;混凝土密封固化剂施工;通过本发明工艺,使地面平整度高,叉车运行平稳,硬度高抗压抗折性能最好、永久性防尘、易清洁、防滑、耐磨高、耐高温,做到一次施工,一劳永逸。
Hollowing-prevention cracking-prevention process of concrete floor leveling layer
The invention provides a hollowing-prevention cracking-prevention process of a concrete floor leveling layer, and belongs to the technical field of concrete construction. The process comprises the following steps of ground milling; warehouse dividing form erecting; steel fiber concrete preparing; steel fiber concrete entering; steel fiber concrete pouring; steel fiber concrete paving by a laser leveling machine; silicon carbide construction and grinding surface press polish; concrete maintaining; seam cutting and filing; and concrete seal curing agent construction. Through the process, the ground is high in levelness, a forklift stably runs, hardness is high, press resistance and bending resistance are best, dust prevention is permanent, cleaning is easy, sliding is prevented, wear resistance is high, high temperature is resisted, and the aim of getting done once and for ever through one-time construction is achieved.
本发明提供了一种混凝土地坪找平层的防空鼓防开裂工艺,属于混凝土施工技术领域,包括如下步骤:铣刨地面;分仓支模;钢纤维混凝土制备;钢纤维混凝土进场;钢纤维混凝土浇注;激光整平机摊铺钢纤维混凝土;金刚砂施工及磨面收光;混凝土养护;切缝填缝;混凝土密封固化剂施工;通过本发明工艺,使地面平整度高,叉车运行平稳,硬度高抗压抗折性能最好、永久性防尘、易清洁、防滑、耐磨高、耐高温,做到一次施工,一劳永逸。
Hollowing-prevention cracking-prevention process of concrete floor leveling layer
一种混凝土地坪找平层的防空鼓防开裂工艺
HUANG CHANGBO (Autor:in)
01.09.2020
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Bridge engineering bridge floor leveling layer hollowing filling equipment and construction method
Europäisches Patentamt | 2021
|