Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building decoration veneer stone dry hanging construction method
The invention relates to a building decoration veneer stone dry hanging construction method. A supporting base, an electric lifting frame, a work flat plate, a fixing plate, a clamping mechanism, bearing assemblies and a drive mechanism are included. The electric lifting frame is arranged in the supporting base. The top of the electric lifting frame is connected with the work flat plate. The drivemechanism is arranged at the upper end of the work flat plate. The upper end of the drive mechanism is connected with the fixing plate. The bearing assemblies are symmetrically arranged on one side of the fixing plate. A supporting plate is welded to the side wall of the fixing plate. The clamping mechanism is arranged at the end position of a supporting rod. A connecting rod is welded to the endposition of the supporting plate. A connecting block is welded to the center position of the bottom of the connecting rod. Trapezoid blocks are arranged on the two side walls of the connecting block.Supporting blocks are connected to the two ends of the connecting block, and trapezoid grooves are formed in the connecting positions of the supporting blocks and the trapezoid blocks. According to the building decoration veneer stone dry hanging construction method, operation is simple and convenient, after construction, stone plates are parallel, inclination cannot happen, and the operation process is safe and reliable.
本发明涉及一种建筑装修饰面石材干挂施工方法,包括支撑底座、电动升降架、工作平板、固定板、夹持机构、承托组件和驱动机构,支撑底座的内部安装有电动升降架,电动升降架的顶部连接有工作平板,工作平板的上端设置有驱动机构,驱动机构的上端连接有固定板,固定板的一侧对称设置有承托组件,固定板的侧壁焊接有支撑板,支撑杆的端头处安装有夹持机构,连接杆焊接在支撑板的端头处,连接杆的底部中心位置焊接有连接块,连接块的两侧壁均设置有梯形块,连接块的两端均连接有支撑块,且支撑块与梯形块的连接处开设有梯形槽,本发明,操作简单便捷,施工后,石板与石板之间均相互平行,不会发生倾斜,且操作过程安全可靠。
Building decoration veneer stone dry hanging construction method
The invention relates to a building decoration veneer stone dry hanging construction method. A supporting base, an electric lifting frame, a work flat plate, a fixing plate, a clamping mechanism, bearing assemblies and a drive mechanism are included. The electric lifting frame is arranged in the supporting base. The top of the electric lifting frame is connected with the work flat plate. The drivemechanism is arranged at the upper end of the work flat plate. The upper end of the drive mechanism is connected with the fixing plate. The bearing assemblies are symmetrically arranged on one side of the fixing plate. A supporting plate is welded to the side wall of the fixing plate. The clamping mechanism is arranged at the end position of a supporting rod. A connecting rod is welded to the endposition of the supporting plate. A connecting block is welded to the center position of the bottom of the connecting rod. Trapezoid blocks are arranged on the two side walls of the connecting block.Supporting blocks are connected to the two ends of the connecting block, and trapezoid grooves are formed in the connecting positions of the supporting blocks and the trapezoid blocks. According to the building decoration veneer stone dry hanging construction method, operation is simple and convenient, after construction, stone plates are parallel, inclination cannot happen, and the operation process is safe and reliable.
本发明涉及一种建筑装修饰面石材干挂施工方法,包括支撑底座、电动升降架、工作平板、固定板、夹持机构、承托组件和驱动机构,支撑底座的内部安装有电动升降架,电动升降架的顶部连接有工作平板,工作平板的上端设置有驱动机构,驱动机构的上端连接有固定板,固定板的一侧对称设置有承托组件,固定板的侧壁焊接有支撑板,支撑杆的端头处安装有夹持机构,连接杆焊接在支撑板的端头处,连接杆的底部中心位置焊接有连接块,连接块的两侧壁均设置有梯形块,连接块的两端均连接有支撑块,且支撑块与梯形块的连接处开设有梯形槽,本发明,操作简单便捷,施工后,石板与石板之间均相互平行,不会发生倾斜,且操作过程安全可靠。
Building decoration veneer stone dry hanging construction method
一种建筑装修饰面石材干挂施工方法
JIANG CHANGJUN (Autor:in) / ZHANG MEI (Autor:in)
24.04.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Dry-hanging, sealing and jointing treatment construction method for building wall decoration stone
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Veneer hanging installation system and veneer wall construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|