Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stone dry-hanging veneer and mounting method thereof
The invention relates to a stone dry-hanging veneer and an installation method thereof, the stone dry-hanging veneer comprises a longitudinal keel, a transverse keel, a stone panel, a bottom fixing piece installed and fixed on the ground and a side face fixing piece installed and fixed on the side face of a building body, and the transverse keel and the longitudinal keel are installed on one side of the building body in a vertically crossed mode. The lower ends of the longitudinal keels are connected with the bottom fixing pieces through connecting pieces, and the side faces of the longitudinal keels are connected with the side face fixing pieces through connecting pieces. A first assembly used for installing the stone panel is installed on the transverse keel, a second assembly corresponding to the first assembly is arranged on the back face of the stone panel, the second assembly can horizontally slide relative to the first assembly, and the stone panel is installed on the transverse keel through cooperation of the first assembly and the second assembly. According to the stone dry-hanging veneer, the assembled keels are adopted, a large amount of welding operation is reduced, and adjustment is convenient; during installation, the stone panel can be pushed to horizontally move to the installation position only by installing the first assembly and the second assembly in a matched mode, and the time for adjusting the position of the stone panel is saved.
本发明涉及一种石材干挂饰面及其安装方法,包括纵向龙骨、横向龙骨、石材面板、安装固定在地面的底部固定件、安装固定在建筑体侧面的侧面固定件,横向龙骨和纵向龙骨垂直交叉安装在建筑体一侧,纵向龙骨的下端与底部固定件通过连接件连接,纵向龙骨的侧面通过连接件与侧面固定件连接;横向龙骨上安装有用以石材面板安装的第一组件,石材面板的背面对应第一组件设有第二组件,第二组件可相对第一组件水平滑动,石材面板通过第一组件和第二组件配合安装在横向龙骨上。本发明的石材干挂饰面采用装配式龙骨,减少大量焊接作业,调整方便;安装时,只需将第一组件和第二组件配合安装,即可推动石材面板平移至安装位置,节省了石材面板调整位置的时间。
Stone dry-hanging veneer and mounting method thereof
The invention relates to a stone dry-hanging veneer and an installation method thereof, the stone dry-hanging veneer comprises a longitudinal keel, a transverse keel, a stone panel, a bottom fixing piece installed and fixed on the ground and a side face fixing piece installed and fixed on the side face of a building body, and the transverse keel and the longitudinal keel are installed on one side of the building body in a vertically crossed mode. The lower ends of the longitudinal keels are connected with the bottom fixing pieces through connecting pieces, and the side faces of the longitudinal keels are connected with the side face fixing pieces through connecting pieces. A first assembly used for installing the stone panel is installed on the transverse keel, a second assembly corresponding to the first assembly is arranged on the back face of the stone panel, the second assembly can horizontally slide relative to the first assembly, and the stone panel is installed on the transverse keel through cooperation of the first assembly and the second assembly. According to the stone dry-hanging veneer, the assembled keels are adopted, a large amount of welding operation is reduced, and adjustment is convenient; during installation, the stone panel can be pushed to horizontally move to the installation position only by installing the first assembly and the second assembly in a matched mode, and the time for adjusting the position of the stone panel is saved.
本发明涉及一种石材干挂饰面及其安装方法,包括纵向龙骨、横向龙骨、石材面板、安装固定在地面的底部固定件、安装固定在建筑体侧面的侧面固定件,横向龙骨和纵向龙骨垂直交叉安装在建筑体一侧,纵向龙骨的下端与底部固定件通过连接件连接,纵向龙骨的侧面通过连接件与侧面固定件连接;横向龙骨上安装有用以石材面板安装的第一组件,石材面板的背面对应第一组件设有第二组件,第二组件可相对第一组件水平滑动,石材面板通过第一组件和第二组件配合安装在横向龙骨上。本发明的石材干挂饰面采用装配式龙骨,减少大量焊接作业,调整方便;安装时,只需将第一组件和第二组件配合安装,即可推动石材面板平移至安装位置,节省了石材面板调整位置的时间。
Stone dry-hanging veneer and mounting method thereof
一种石材干挂饰面及其安装方法
WANG JIASHENG (Autor:in) / CHEN YANYANG (Autor:in) / LIU MIAOMIAO (Autor:in) / JI HUIHUI (Autor:in) / XU SHIYI (Autor:in) / ZHU FUBIN (Autor:in)
01.11.2022
Patent
Elektronische Ressource
Chinesisch
Dry hanging structure assembly and method for mounting stone veneer
Europäisches Patentamt | 2015
|Building decoration veneer stone dry hanging construction method
Europäisches Patentamt | 2020
|Wood keel framework veneer hanging structure and mounting method
Europäisches Patentamt | 2020
|Stone dry hanging assembly and mounting method thereof
Europäisches Patentamt | 2021
|