Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated type cable pit and construction method thereof
The invention discloses a prefabricated type cable pit comprising a prefabricated base board, two prefabricated side walls, two prefabricated end walls and a plurality of bolts. Steel bars are buriedin the prefabricated base board and extend out from the prefabricated base board. The two prefabricated side walls and the two prefabricated end walls are provided with receding holes, and sleeves areburied in the two prefabricated side walls and the two prefabricated end walls. The sleeves communicate with the receding holes. The steel bars extend into the sleeves and extend out from the receding holes. The bolts are connected with the ends of the steel bars in a fastened manner, so that the two prefabricated side walls and the two prefabricated end walls are fixed to the prefabricated baseboard. The two prefabricated side walls and the two prefabricated end walls are both provided with grouting holes. The grouting holes enable slurry fixed-connection layers to be formed between the prefabricated base board and the two prefabricated side walls and between the prefabricated base board and the two prefabricated end walls. During construction, workers just need on-site assembly, and on-site manual bricklaying and on-site concrete pouring are not needed. The construction quality is convenient to manage and control, the construction speed is rapid, and the work period is short. The invention further relates to a construction method of the prefabricated type cable pit.
本发明公开了一种预制装配式电缆井,包括预制底板、两预制侧墙、两预制端墙及若干螺栓,预制底板内部埋设有钢筋,钢筋从预制底板伸出,两预制侧墙及两预制端墙设有避位孔并内部埋设有套筒,套筒与避位孔连通,钢筋伸入套筒并从避位孔伸出,螺栓与钢筋端部紧固连接使两预制侧墙及两预制端墙分别与预制底板固定,两预制侧墙及两预制端墙均设有灌浆孔,灌浆孔使预制底板与两预制侧墙及两预制端墙之间形成浆料固接层,施工时只需现场组装,无需现场人工砌砖或现场混凝土浇筑,施工质量便于管控,并且速度快、工期短。本发明还涉及上述预制装配式电缆井的施工方法。
Prefabricated type cable pit and construction method thereof
The invention discloses a prefabricated type cable pit comprising a prefabricated base board, two prefabricated side walls, two prefabricated end walls and a plurality of bolts. Steel bars are buriedin the prefabricated base board and extend out from the prefabricated base board. The two prefabricated side walls and the two prefabricated end walls are provided with receding holes, and sleeves areburied in the two prefabricated side walls and the two prefabricated end walls. The sleeves communicate with the receding holes. The steel bars extend into the sleeves and extend out from the receding holes. The bolts are connected with the ends of the steel bars in a fastened manner, so that the two prefabricated side walls and the two prefabricated end walls are fixed to the prefabricated baseboard. The two prefabricated side walls and the two prefabricated end walls are both provided with grouting holes. The grouting holes enable slurry fixed-connection layers to be formed between the prefabricated base board and the two prefabricated side walls and between the prefabricated base board and the two prefabricated end walls. During construction, workers just need on-site assembly, and on-site manual bricklaying and on-site concrete pouring are not needed. The construction quality is convenient to manage and control, the construction speed is rapid, and the work period is short. The invention further relates to a construction method of the prefabricated type cable pit.
本发明公开了一种预制装配式电缆井,包括预制底板、两预制侧墙、两预制端墙及若干螺栓,预制底板内部埋设有钢筋,钢筋从预制底板伸出,两预制侧墙及两预制端墙设有避位孔并内部埋设有套筒,套筒与避位孔连通,钢筋伸入套筒并从避位孔伸出,螺栓与钢筋端部紧固连接使两预制侧墙及两预制端墙分别与预制底板固定,两预制侧墙及两预制端墙均设有灌浆孔,灌浆孔使预制底板与两预制侧墙及两预制端墙之间形成浆料固接层,施工时只需现场组装,无需现场人工砌砖或现场混凝土浇筑,施工质量便于管控,并且速度快、工期短。本发明还涉及上述预制装配式电缆井的施工方法。
Prefabricated type cable pit and construction method thereof
预制装配式电缆井及其施工方法
ZHU HAIQING (Autor:in) / LIU YADONG (Autor:in) / ZHAO HUI (Autor:in) / MA HAIYING (Autor:in) / XUE FEI (Autor:in)
01.05.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated cable trench and construction method thereof
Europäisches Patentamt | 2024
|Prefabricated assembly type cable working well and construction method thereof
Europäisches Patentamt | 2020
|Prefabricated cable duct bank and construction method thereof
Europäisches Patentamt | 2021
|Zipper occlusion type prefabricated cable bent tower and construction method thereof
Europäisches Patentamt | 2024
|Prefabricated assembly type octagonal cable well and construction method
Europäisches Patentamt | 2023
|