Rain and sewage flow dividing construction method applied to building
The invention provides a rain and sewage flow dividing construction method applied to a building, and belongs to the technical field of building construction. The rain and sewage flow dividing construction method comprises the following steps that a home-entry blow-off pipe is laid, a water inlet of the home-entry blow-off pipe communicates with a sewage discharge outlet of the building, and the sewage discharge outlet of the building is a non-toilet sewage discharge outlet; a water outlet of the home-entry blow-off pipe communicates with a first closed conduit for temporary flow guiding, andthe first closed conduit is located between the building and a first inspection well; a first sewage pipeline connected with a peripheral pipe network is newly built in the first inspection well; andafter the first sewage pipeline and the peripheral pipe network meet a connection condition, the home-entry blow-off pipe extends in the first closed conduit, so that the water outlet of the home-entry blow-off pipe communicates with the first inspection well. According to the rain and sewage flow dividing construction method applied to the building, the closed conduit is used for temporary flow dividing in the construction period, so that the construction of the home-entry blow-off pipe can be carried out in the construction period of the sewage pipeline, and inconvenience brought to sewage discharge of residents in the construction period of the sewage pipeline is reduced.
本申请提供了一种应用于建筑物的雨污分流施工方法,属于建筑施工技术领域。该雨污分流施工方法包括:铺设入户排污管,并将入户排污管的入水口与建筑物的污水排放口连通,其中,建筑物的污水排放口为非厕所污水排放口;将入户排污管的出水口连通至第一暗渠做临时导流,其中,第一暗渠位于建筑物与第一检查井之间;在第一检查井内新建与外围管网接驳的第一污水管道;当第一污水管道与外围管网满足接驳条件后,在第一暗渠内延伸入户排污管,使入户排污管的出水口与第一检查井连通。本申请通过在施工期间利用暗渠做临时导流,实现了在污水管道施工期间即可进行入户排污管的施工,降低了污水管道施工期间给住户污水排放带来的不便。
Rain and sewage flow dividing construction method applied to building
The invention provides a rain and sewage flow dividing construction method applied to a building, and belongs to the technical field of building construction. The rain and sewage flow dividing construction method comprises the following steps that a home-entry blow-off pipe is laid, a water inlet of the home-entry blow-off pipe communicates with a sewage discharge outlet of the building, and the sewage discharge outlet of the building is a non-toilet sewage discharge outlet; a water outlet of the home-entry blow-off pipe communicates with a first closed conduit for temporary flow guiding, andthe first closed conduit is located between the building and a first inspection well; a first sewage pipeline connected with a peripheral pipe network is newly built in the first inspection well; andafter the first sewage pipeline and the peripheral pipe network meet a connection condition, the home-entry blow-off pipe extends in the first closed conduit, so that the water outlet of the home-entry blow-off pipe communicates with the first inspection well. According to the rain and sewage flow dividing construction method applied to the building, the closed conduit is used for temporary flow dividing in the construction period, so that the construction of the home-entry blow-off pipe can be carried out in the construction period of the sewage pipeline, and inconvenience brought to sewage discharge of residents in the construction period of the sewage pipeline is reduced.
本申请提供了一种应用于建筑物的雨污分流施工方法,属于建筑施工技术领域。该雨污分流施工方法包括:铺设入户排污管,并将入户排污管的入水口与建筑物的污水排放口连通,其中,建筑物的污水排放口为非厕所污水排放口;将入户排污管的出水口连通至第一暗渠做临时导流,其中,第一暗渠位于建筑物与第一检查井之间;在第一检查井内新建与外围管网接驳的第一污水管道;当第一污水管道与外围管网满足接驳条件后,在第一暗渠内延伸入户排污管,使入户排污管的出水口与第一检查井连通。本申请通过在施工期间利用暗渠做临时导流,实现了在污水管道施工期间即可进行入户排污管的施工,降低了污水管道施工期间给住户污水排放带来的不便。
Rain and sewage flow dividing construction method applied to building
一种应用于建筑物的雨污分流施工方法
KONG DE'AN (Autor:in) / ZHU XIANJIE (Autor:in) / GU XIAOYUAN (Autor:in) / MA TAO (Autor:in) / SHANG FANGZE (Autor:in) / SU LIANGYUAN (Autor:in) / LI XINPENG (Autor:in) / LYU BAOJUN (Autor:in)
01.05.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Rain and sewage diversion construction method applied to building
Europäisches Patentamt | 2020
|Rain and sewage flow-dividing well suitable for confluence and drainage of buildings
Europäisches Patentamt | 2020
|Water drop energy dissipation vertical shaft for rain and sewage flow dividing and inflow
Europäisches Patentamt | 2020
|