Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Utility tunnel
The invention discloses a utility tunnel. The utility tunnel comprises a tunnel, a tunnel entering water pipe, a water collecting pit, a first drainage mechanism and a second drainage mechanism, wherein the tunnel entering water pipe is arranged in the tunnel and laid along the tunnel; the water collecting pit is arranged at a low-lying position of the tunnel; the first drainage mechanism comprises a first drainage pump configured to deliver water in the water collecting pit out of the tunnel; and the second drainage mechanism comprises a second drainage pump connected with the tunnel enteringwater pipe at the low-lying position of the tunnel and configured to deliver water in the tunnel entering water pipe out of the tunnel. The water collecting pit for drainage under tunnel bottom plates and drainage of the ground in the tunnel are combined, so that the defects of high flow of water pumps, difficult water pump type selection, large size of a water collecting pit, large constructiondifficulty and the like in the traditional way that only an underground water collecting pit is arranged are effectively overcome, the construction risk is effectively lowered, and the influence of water collecting pit construction on the structure safety of the tunnel is reduced; and meanwhile, it can be guaranteed that drainage of the tunnel meets requirements, the engineering cost is greatly saved, and the construction period is effectively shortened.
本发明公开了一种综合管廊,包括管廊;入廊水管,设在所述管廊中,并沿所述管廊铺设;集水坑,设在所述管廊的低洼位置;第一排水机构,包括第一排水泵,用于将所述集水坑中的水送至管廊外;第二排水机构,包括第二排水泵,所述第二排水泵在所述管廊的低洼位置与所述入廊水管相连接,用于将所述入廊水管中的水送至所述管廊外。其采用管廊底板下集水坑排水与管廊内地面排水相结合的形式,有效的解决了传统只设地下集水坑进行排水水泵流量大选型困难、集水坑尺寸大、施工难度大等缺点,有效的降低施工风险、减少了集水坑施工对管廊结构安全影响,同时又能保证管廊排水满足要求,且大大节省工程造价,有效缩短了工期。
Utility tunnel
The invention discloses a utility tunnel. The utility tunnel comprises a tunnel, a tunnel entering water pipe, a water collecting pit, a first drainage mechanism and a second drainage mechanism, wherein the tunnel entering water pipe is arranged in the tunnel and laid along the tunnel; the water collecting pit is arranged at a low-lying position of the tunnel; the first drainage mechanism comprises a first drainage pump configured to deliver water in the water collecting pit out of the tunnel; and the second drainage mechanism comprises a second drainage pump connected with the tunnel enteringwater pipe at the low-lying position of the tunnel and configured to deliver water in the tunnel entering water pipe out of the tunnel. The water collecting pit for drainage under tunnel bottom plates and drainage of the ground in the tunnel are combined, so that the defects of high flow of water pumps, difficult water pump type selection, large size of a water collecting pit, large constructiondifficulty and the like in the traditional way that only an underground water collecting pit is arranged are effectively overcome, the construction risk is effectively lowered, and the influence of water collecting pit construction on the structure safety of the tunnel is reduced; and meanwhile, it can be guaranteed that drainage of the tunnel meets requirements, the engineering cost is greatly saved, and the construction period is effectively shortened.
本发明公开了一种综合管廊,包括管廊;入廊水管,设在所述管廊中,并沿所述管廊铺设;集水坑,设在所述管廊的低洼位置;第一排水机构,包括第一排水泵,用于将所述集水坑中的水送至管廊外;第二排水机构,包括第二排水泵,所述第二排水泵在所述管廊的低洼位置与所述入廊水管相连接,用于将所述入廊水管中的水送至所述管廊外。其采用管廊底板下集水坑排水与管廊内地面排水相结合的形式,有效的解决了传统只设地下集水坑进行排水水泵流量大选型困难、集水坑尺寸大、施工难度大等缺点,有效的降低施工风险、减少了集水坑施工对管廊结构安全影响,同时又能保证管廊排水满足要求,且大大节省工程造价,有效缩短了工期。
Utility tunnel
一种综合管廊
XIE FENGBO (Autor:in) / LI LINLIN (Autor:in) / ZHANG YUANDONG (Autor:in) / SUN JING (Autor:in) / DAI YONGXING (Autor:in) / BIE XUFENG (Autor:in) / JIANG ZHUO (Autor:in) / LIU CONGSHENG (Autor:in)
12.05.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Mine utility tunnel technology, mine utility tunnel and mine system
Europäisches Patentamt | 2023
|