Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Utility tunnel
The comprehensive pipe gallery comprises a concrete pipe body, a first high-pressure bin, a second high-pressure bin and a comprehensive bin, the first high-pressure bin is formed in the concrete pipe body, the second high-pressure bin is formed in the concrete pipe body, and the second high-pressure bin is located on one side of the first high-pressure bin; a comprehensive bin is formed in the concrete pipe body, three sets of ventilation pipelines are installed on the top wall of the concrete pipe body in a penetrating mode, the bottom ends of the first set of ventilation pipelines penetrate through the top wall of the first high-pressure bin, the bottom ends of the second set of ventilation pipelines penetrate through the top wall of the second high-pressure bin, and the bottom ends of the third set of ventilation pipelines penetrate through the top wall of the comprehensive bin. According to the pipe gallery, the ventilation pipeline is installed, the ventilation pipeline sucks outside air into the pipe gallery, outside moisture and air are intercepted by the filter screen, dust and water vapor are prevented from entering the pipe gallery through the ventilation pipeline, a large amount of dust is prevented from being accumulated in the first high-pressure bin, the second high-pressure bin and the comprehensive bin, and the dryness of the interiors is guaranteed.
本发明公开了一种综合管廊,包括混凝土管体、第一高压仓、第二高压仓和综合仓,所述混凝土管体的内部开设有第一高压仓,所述混凝土管体的内部开设有第二高压仓,且第二高压仓位于第一高压仓的一侧,所述混凝土管体的内部开设有综合仓,所述混凝土管体的顶壁贯穿安装有三组通风管道,第一组通风管道底端贯穿第一高压仓的顶壁,第二组通风管道底端贯穿第二高压仓的顶壁,且第三组通风管道的底端贯穿综合仓的顶壁。本发明通过安装有通风管道,通风管道吸取外界的空气进入,由过滤网拦截外界的水分和空气,避免灰尘和水汽通过通风管道进入到管廊的内部,避免第一高压仓、第二高压仓和综合仓内部出现灰尘大量堆积,保证内部的干燥性。
Utility tunnel
The comprehensive pipe gallery comprises a concrete pipe body, a first high-pressure bin, a second high-pressure bin and a comprehensive bin, the first high-pressure bin is formed in the concrete pipe body, the second high-pressure bin is formed in the concrete pipe body, and the second high-pressure bin is located on one side of the first high-pressure bin; a comprehensive bin is formed in the concrete pipe body, three sets of ventilation pipelines are installed on the top wall of the concrete pipe body in a penetrating mode, the bottom ends of the first set of ventilation pipelines penetrate through the top wall of the first high-pressure bin, the bottom ends of the second set of ventilation pipelines penetrate through the top wall of the second high-pressure bin, and the bottom ends of the third set of ventilation pipelines penetrate through the top wall of the comprehensive bin. According to the pipe gallery, the ventilation pipeline is installed, the ventilation pipeline sucks outside air into the pipe gallery, outside moisture and air are intercepted by the filter screen, dust and water vapor are prevented from entering the pipe gallery through the ventilation pipeline, a large amount of dust is prevented from being accumulated in the first high-pressure bin, the second high-pressure bin and the comprehensive bin, and the dryness of the interiors is guaranteed.
本发明公开了一种综合管廊,包括混凝土管体、第一高压仓、第二高压仓和综合仓,所述混凝土管体的内部开设有第一高压仓,所述混凝土管体的内部开设有第二高压仓,且第二高压仓位于第一高压仓的一侧,所述混凝土管体的内部开设有综合仓,所述混凝土管体的顶壁贯穿安装有三组通风管道,第一组通风管道底端贯穿第一高压仓的顶壁,第二组通风管道底端贯穿第二高压仓的顶壁,且第三组通风管道的底端贯穿综合仓的顶壁。本发明通过安装有通风管道,通风管道吸取外界的空气进入,由过滤网拦截外界的水分和空气,避免灰尘和水汽通过通风管道进入到管廊的内部,避免第一高压仓、第二高压仓和综合仓内部出现灰尘大量堆积,保证内部的干燥性。
Utility tunnel
一种综合管廊
LI YONG (Autor:in) / ZHOU BO (Autor:in) / HUANG HAIQING (Autor:in) / ZHANG JIANHONG (Autor:in) / REN JIAWEI (Autor:in) / WU FAN (Autor:in)
25.10.2022
Patent
Elektronische Ressource
Chinesisch
Mine utility tunnel technology, mine utility tunnel and mine system
Europäisches Patentamt | 2023
|Utility tunnel supporting structure crossing power tunnel
Europäisches Patentamt | 2023
|