High fill structure for existing tunnel soil foundation and construction method
The invention discloses a high fill structure for existing tunnel soil foundation and a construction method. The high fill structure comprises bearing isolation piles, a bearing foundation, a lightweight concrete body, filling bodies and composite geomembranes, wherein the bearing isolation piles are arranged on the positions, on the two sides of an existing tunnel, of the rock foundation at intervals and extend into the soil foundation at the upper portion of the rock foundation, and the existing tunnel is located in the soil foundation; the bearing foundation is connected to the tops of thebearing isolation piles, and the bearing foundation is located above the soil foundation; the lightweight concrete body is arranged at the top of the bearing foundation; the filling bodies are arranged on the soil foundation and fill the two sides of the bearing foundation and the two sides of the lightweight concrete body; and the composite geomembranes are arranged between the bearing foundationand the filling bodies and between the lightweight concrete body and the filling bodies. The high fill structure is simple, convenient to construct and good in effect.
本发明公开了一种既有隧道土质地基高填方结构及构筑方法,该高填方结构包括承载隔离桩,间隔设置在既有隧道两侧的岩质地基上,并伸入岩质地基上部的土质地基,既有隧道位于土质地基内;承载基础,连接于承载隔离桩顶部,承载基础位于土质地基上方;轻质混凝土体,设于承载基础顶部;填方体,设于土质地基上,填筑于承载基础和轻质混凝土体的两侧;复合土工膜,设于承载基础和填方体之间,以及轻质混凝土体和填方体之间。该高填方结构简单,便于施工,效果良好。
High fill structure for existing tunnel soil foundation and construction method
The invention discloses a high fill structure for existing tunnel soil foundation and a construction method. The high fill structure comprises bearing isolation piles, a bearing foundation, a lightweight concrete body, filling bodies and composite geomembranes, wherein the bearing isolation piles are arranged on the positions, on the two sides of an existing tunnel, of the rock foundation at intervals and extend into the soil foundation at the upper portion of the rock foundation, and the existing tunnel is located in the soil foundation; the bearing foundation is connected to the tops of thebearing isolation piles, and the bearing foundation is located above the soil foundation; the lightweight concrete body is arranged at the top of the bearing foundation; the filling bodies are arranged on the soil foundation and fill the two sides of the bearing foundation and the two sides of the lightweight concrete body; and the composite geomembranes are arranged between the bearing foundationand the filling bodies and between the lightweight concrete body and the filling bodies. The high fill structure is simple, convenient to construct and good in effect.
本发明公开了一种既有隧道土质地基高填方结构及构筑方法,该高填方结构包括承载隔离桩,间隔设置在既有隧道两侧的岩质地基上,并伸入岩质地基上部的土质地基,既有隧道位于土质地基内;承载基础,连接于承载隔离桩顶部,承载基础位于土质地基上方;轻质混凝土体,设于承载基础顶部;填方体,设于土质地基上,填筑于承载基础和轻质混凝土体的两侧;复合土工膜,设于承载基础和填方体之间,以及轻质混凝土体和填方体之间。该高填方结构简单,便于施工,效果良好。
High fill structure for existing tunnel soil foundation and construction method
一种既有隧道土质地基高填方结构及构筑方法
YAO YUCHUN (Autor:in) / ZHANG YAO (Autor:in) / WEI YAOHU (Autor:in) / YUAN BIYU (Autor:in) / GAO JITAO (Autor:in)
05.06.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Thick-layer soil foundation tunnel open cut tunnel high fill structure and constructing method
Europäisches Patentamt | 2020
|Combined reinforcement construction method for high-fill plain soil soft foundation
Europäisches Patentamt | 2021
|Method for excavation construction of foundation pit above existing tunnel
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|