The invention discloses a waterproof construction method for a water conservancy project. The waterproof construction method comprises the following steps of S1, construction preparation: carrying outland acquisition on a to-be-constructed field, and selecting a construction administration and management unit and a construction contracting unit; S2, production preparation: equipping production and management staff according to a demand on production and operation, and then transferring materials needed by construction to an appointed area; S3, excavation: excavating a determined constructionarea by an excavator, and measuring an excavated canal to ensure that the error is in an allowable range; and S4, C30 concrete pouring: selecting a reinforcing steel bar template, setting the size ofthe reinforcing steel bar template according to the dimension in the field and then pouring the reinforcing steel bar template with C30 concrete. The waterproof construction method for the water conservancy project is rigorous in working step, can shorten the construction period effectively, improves the work efficiency, is good in waterproof performance, guarantees safe construction, and is strict in acceptance inspection and suitable for being popularized and applied.
本发明公开了一种水利工程防水施工方法,包括以下步骤:S1:施工准备:对需要的施工现场进行征地,选定建设监理单位和施工承包单位;S2:生产准备:按照生产运营的要求,配备生产管理人员,然后将施工所需的材料运送至指定的区域;S3:开挖:通过挖机对确定的施工区域进行开挖,开挖后需要对开挖的沟渠进行测量,保证误差在允许的范围内;S4:C30混凝土浇筑:选择钢筋模板,根据现场的尺寸设定钢筋模板的大小,然后采用C30混凝土对钢筋模板进行浇筑。通过本发明水利工程防水施工方法,工作步骤严谨,可有效的缩短工期,提高工作的效率,防水性能好,保证安全施工,验收严格,适合推广使用。
The invention discloses a waterproof construction method for a water conservancy project. The waterproof construction method comprises the following steps of S1, construction preparation: carrying outland acquisition on a to-be-constructed field, and selecting a construction administration and management unit and a construction contracting unit; S2, production preparation: equipping production and management staff according to a demand on production and operation, and then transferring materials needed by construction to an appointed area; S3, excavation: excavating a determined constructionarea by an excavator, and measuring an excavated canal to ensure that the error is in an allowable range; and S4, C30 concrete pouring: selecting a reinforcing steel bar template, setting the size ofthe reinforcing steel bar template according to the dimension in the field and then pouring the reinforcing steel bar template with C30 concrete. The waterproof construction method for the water conservancy project is rigorous in working step, can shorten the construction period effectively, improves the work efficiency, is good in waterproof performance, guarantees safe construction, and is strict in acceptance inspection and suitable for being popularized and applied.
本发明公开了一种水利工程防水施工方法,包括以下步骤:S1:施工准备:对需要的施工现场进行征地,选定建设监理单位和施工承包单位;S2:生产准备:按照生产运营的要求,配备生产管理人员,然后将施工所需的材料运送至指定的区域;S3:开挖:通过挖机对确定的施工区域进行开挖,开挖后需要对开挖的沟渠进行测量,保证误差在允许的范围内;S4:C30混凝土浇筑:选择钢筋模板,根据现场的尺寸设定钢筋模板的大小,然后采用C30混凝土对钢筋模板进行浇筑。通过本发明水利工程防水施工方法,工作步骤严谨,可有效的缩短工期,提高工作的效率,防水性能好,保证安全施工,验收严格,适合推广使用。
Water conservancy project waterproof roll construction method
Europäisches Patentamt | 2023
|Waterproof construction method for water conservancy project
Europäisches Patentamt | 2022
|Water conservancy project waterproof roll construction method
Europäisches Patentamt | 2021
|Water conservancy project waterproof slope construction method
Europäisches Patentamt | 2023
|Water conservancy project construction waterproof drainage device
Europäisches Patentamt | 2021
|