Construction method for building engineering bridge pile structure
The invention discloses a construction method, particularly relates to a construction method for building an engineering bridge pile structure, and belongs to the technical field of municipal highwayengineering structure building construction processes. The construction method for building the engineering bridge is simple in structure and convenient to construct and operate. The pile column structure comprises a pile foundation, a pile column and a bent cap. According to the construction method, the pouring of the pile foundation and the pile column is continuously completed at a time throughtwo times of hole forming and one time of cylinder pressing; the bent cap is poured; a covering layer on the outer side of a pile casing is excavated and removed; the construction work of the engineering bridge pile column structure is completed. Secondary hole forming is conducted after primary hole forming is completed and the pile casing is pressed in.
本发明公开了一种施工方法,尤其是公开了涉及一种用于工程桥梁桩柱结构建造的施工方法,属于市政公路工程构筑物建造施工工艺技术领域。提供一种结构简单,施工操作方便的用于工程桥梁桩柱结构建造的施工方法。所述的桩柱结构包括桩基、桩柱和盖梁,所述的施工方法通过两次成孔,一次压筒,一次性连续完成桩基和桩柱的浇筑,最后浇筑盖梁,并开挖清除护筒外侧的覆盖层完成所述工程桥梁桩柱结构的建造工作,其中,二次成孔放在一次成孔完成并压入护筒之后进行。
Construction method for building engineering bridge pile structure
The invention discloses a construction method, particularly relates to a construction method for building an engineering bridge pile structure, and belongs to the technical field of municipal highwayengineering structure building construction processes. The construction method for building the engineering bridge is simple in structure and convenient to construct and operate. The pile column structure comprises a pile foundation, a pile column and a bent cap. According to the construction method, the pouring of the pile foundation and the pile column is continuously completed at a time throughtwo times of hole forming and one time of cylinder pressing; the bent cap is poured; a covering layer on the outer side of a pile casing is excavated and removed; the construction work of the engineering bridge pile column structure is completed. Secondary hole forming is conducted after primary hole forming is completed and the pile casing is pressed in.
本发明公开了一种施工方法,尤其是公开了涉及一种用于工程桥梁桩柱结构建造的施工方法,属于市政公路工程构筑物建造施工工艺技术领域。提供一种结构简单,施工操作方便的用于工程桥梁桩柱结构建造的施工方法。所述的桩柱结构包括桩基、桩柱和盖梁,所述的施工方法通过两次成孔,一次压筒,一次性连续完成桩基和桩柱的浇筑,最后浇筑盖梁,并开挖清除护筒外侧的覆盖层完成所述工程桥梁桩柱结构的建造工作,其中,二次成孔放在一次成孔完成并压入护筒之后进行。
Construction method for building engineering bridge pile structure
用于工程桥梁桩柱结构建造的施工方法
DAI ZUFA (Autor:in) / WANG YONGWEN (Autor:in) / QIN JIANHUA (Autor:in)
23.06.2020
Patent
Elektronische Ressource
Chinesisch
Highway bridge pile foundation reinforcement building construction method
Europäisches Patentamt | 2021
|Building engineering pile foundation construction method
Europäisches Patentamt | 2025
|Hydraulic engineering bridge pile foundation construction device
Europäisches Patentamt | 2024
|Pile position calibration device for bridge engineering pile foundation construction
Europäisches Patentamt | 2021
|