Drainage construction method of same-layer drainage pre-buried water collector
A drainage construction method of a same-layer drainage pre-buried water collector is characterized by including the following steps of a, pre-burying and fixing the water collector; b, performing a closed water test on the structure of a caisson; c, cleaning the caisson and constructing a leveling layer; d, cleaning the caisson and performing leveling; e, installing a vertical pipe; f, performinga secondary closed water test on the caisson; g, constructing a pipe well; h, installing a branch pipe; i, performing filling with ceramsite; and j, laying floor tiles. The drainage construction method of the same-layer drainage pre-buried water collector has the advantages that the drainage construction process is simple, operation is convenient, the drainage construction process of the same-layer drainage pre-buried water collector is convenient and easy to implement, the potential water seepage hazards are greatly reduced, the effect is remarkable, no side drainage floor drains are installed, and engineering cost is reduced.
一种同层排水预埋集水器排水施工方法,其特征在于包括以下步骤:a、集水器预埋固定,b、沉箱结构闭水试验,c、沉箱清理及找平层施工,d、沉箱清理及找平,e、立管安装,f、沉箱二次闭水试验,g、砌筑管井,h、安装支管,i、陶粒填充,j、地砖铺贴。本发明的同层排水预埋集水器排水施工方法具有排水施工工艺简单,操作方便,同层排水预埋集水器排水施工工艺施工方便简单,大大减少渗水隐患,效果显著,避免安装侧排地漏和降低工程成本的优点。
Drainage construction method of same-layer drainage pre-buried water collector
A drainage construction method of a same-layer drainage pre-buried water collector is characterized by including the following steps of a, pre-burying and fixing the water collector; b, performing a closed water test on the structure of a caisson; c, cleaning the caisson and constructing a leveling layer; d, cleaning the caisson and performing leveling; e, installing a vertical pipe; f, performinga secondary closed water test on the caisson; g, constructing a pipe well; h, installing a branch pipe; i, performing filling with ceramsite; and j, laying floor tiles. The drainage construction method of the same-layer drainage pre-buried water collector has the advantages that the drainage construction process is simple, operation is convenient, the drainage construction process of the same-layer drainage pre-buried water collector is convenient and easy to implement, the potential water seepage hazards are greatly reduced, the effect is remarkable, no side drainage floor drains are installed, and engineering cost is reduced.
一种同层排水预埋集水器排水施工方法,其特征在于包括以下步骤:a、集水器预埋固定,b、沉箱结构闭水试验,c、沉箱清理及找平层施工,d、沉箱清理及找平,e、立管安装,f、沉箱二次闭水试验,g、砌筑管井,h、安装支管,i、陶粒填充,j、地砖铺贴。本发明的同层排水预埋集水器排水施工方法具有排水施工工艺简单,操作方便,同层排水预埋集水器排水施工工艺施工方便简单,大大减少渗水隐患,效果显著,避免安装侧排地漏和降低工程成本的优点。
Drainage construction method of same-layer drainage pre-buried water collector
同层排水预埋集水器排水施工方法
SHANG NINGZHOU (Autor:in)
26.06.2020
Patent
Elektronische Ressource
Chinesisch
Buried permeable drainage structure and buried permeable drainage structure construction method
Europäisches Patentamt | 2023
|Construction method for assisting surface layer drainage of basement pre-buried drainage pipe
Europäisches Patentamt | 2024
|Adjustable non-descending plate same-layer drainage collector
Europäisches Patentamt | 2023
|Same-layer drainage collector with double vertical pipes
Europäisches Patentamt | 2023
|