Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses river-filled road construction equipment. The equipment structurally comprises a fixed seat, bevel edge seats and a soil filling device, the fixed seat is fixedly connected with the bevel edge seats, two bevel edge seats are oppositely arranged in a symmetrical structure, the beveled edge seats and the fixed seat form an isosceles trapezoid shape, and the soil filling device is mounted in the isosceles trapezoid formed by the side seats and the fixed seat. The equipment has the following beneficial effects: a driving plate is controlled by an external machine to do lifting motion to make a filler in a filling cavity pressed downwards by the plate body, and in the ascending process, a poke rod is pushed to move along with the driving plate, so that a clamping rod isseparated from a clamping groove in a fixed rod, a hammer block moves downwards to further tamp the filler in the filling cavity, the filler is filled in a pit of a river channel in a centralized andsolid state, and the foundation of a road is further reinforced.
本发明公开了一种填河道路施工设备,其结构包括固定座、斜边座、填土装置,固定座与斜边座固定连接,斜边座设有两个,并且呈对称结构相对设立,斜边座与固定座构成等腰梯形状,填土装置安装在边座与固定座构成的等腰梯形内,本发明的有益效果:借助外机械控制驱动板做升降运动,使得板体将填充腔内的填充物向下压,并在上升的过程中推动拨动杆随之运动,使得卡杆与固定杆上的卡槽分离,从而锤块向下运动,对填充腔内的填充物料进行进一步的夯实,使得填充物以集中并且固形的状态填充在河道的坑中,进一步加固了道路的基础。
The invention discloses river-filled road construction equipment. The equipment structurally comprises a fixed seat, bevel edge seats and a soil filling device, the fixed seat is fixedly connected with the bevel edge seats, two bevel edge seats are oppositely arranged in a symmetrical structure, the beveled edge seats and the fixed seat form an isosceles trapezoid shape, and the soil filling device is mounted in the isosceles trapezoid formed by the side seats and the fixed seat. The equipment has the following beneficial effects: a driving plate is controlled by an external machine to do lifting motion to make a filler in a filling cavity pressed downwards by the plate body, and in the ascending process, a poke rod is pushed to move along with the driving plate, so that a clamping rod isseparated from a clamping groove in a fixed rod, a hammer block moves downwards to further tamp the filler in the filling cavity, the filler is filled in a pit of a river channel in a centralized andsolid state, and the foundation of a road is further reinforced.
本发明公开了一种填河道路施工设备,其结构包括固定座、斜边座、填土装置,固定座与斜边座固定连接,斜边座设有两个,并且呈对称结构相对设立,斜边座与固定座构成等腰梯形状,填土装置安装在边座与固定座构成的等腰梯形内,本发明的有益效果:借助外机械控制驱动板做升降运动,使得板体将填充腔内的填充物向下压,并在上升的过程中推动拨动杆随之运动,使得卡杆与固定杆上的卡槽分离,从而锤块向下运动,对填充腔内的填充物料进行进一步的夯实,使得填充物以集中并且固形的状态填充在河道的坑中,进一步加固了道路的基础。
River-filled road construction equipment
一种填河道路施工设备
LU KAILONG (Autor:in)
03.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE