Integral lifting construction method for hanging and assembling spherical net rack
The invention discloses an integral lifting construction method for hanging and assembling a spherical net rack, and belongs to the technical field of net rack structure construction. The method comprises the following steps of: 1, establishing a finite element analysis model of the grid structure by applying Midas/Gen finite element analysis software according to the composition form of the spherical grid structure; 2, according to the analysis and verification result in the step 1, dividing the splicing and lifting stage or lifting height of the spherical grid structure in combination with the actual space size of the structure; 3, arranging a lifting platform and a lifting hanging point, and a hydraulic synchronous lifting system is installed; 4, after each lifting height is increased,repeating the assembling process of the next lifting unit in the step 2 and the lifting process of the next lifting unit in the step 3; 5, continuously lifting the whole ball structure assembled in the step 4 to the position 100-200 mm away from the designed elevation; and 6, performing step-by-step unloading of the hydraulic lifting system. The spherical structure is adopted for segmented assembly and overall lifting, the construction speed is high, and safety and reliability are achieved.
本发明公开了一种球形网架悬挂拼装整体提升施工方法,属于网架结构施工技术领域。本发明的步骤为:步骤1:根据球形网架结构组成形式,应用Midas/Gen有限元分析软件建立网架结构有限元分析模型;步骤2:根据步骤1的分析验证结果结合结构实际空间尺寸划分球形网架结构的拼接及提升阶段或提升高度;步骤3、设置提升平台和提升吊点,安装液压同步提升系统;步骤4、每提升一个高度后重复进行步骤2中的下一提升单元的拼装和步骤3中的下一提升单元提升过程;步骤5、将步骤4中拼装完成的整球结构继续提升至距设计标高100‑200mm处;步骤6、进行液压提升系统逐级卸载。本发明采用球形结构分段拼装整体提升,施工速率高,安全可靠。
Integral lifting construction method for hanging and assembling spherical net rack
The invention discloses an integral lifting construction method for hanging and assembling a spherical net rack, and belongs to the technical field of net rack structure construction. The method comprises the following steps of: 1, establishing a finite element analysis model of the grid structure by applying Midas/Gen finite element analysis software according to the composition form of the spherical grid structure; 2, according to the analysis and verification result in the step 1, dividing the splicing and lifting stage or lifting height of the spherical grid structure in combination with the actual space size of the structure; 3, arranging a lifting platform and a lifting hanging point, and a hydraulic synchronous lifting system is installed; 4, after each lifting height is increased,repeating the assembling process of the next lifting unit in the step 2 and the lifting process of the next lifting unit in the step 3; 5, continuously lifting the whole ball structure assembled in the step 4 to the position 100-200 mm away from the designed elevation; and 6, performing step-by-step unloading of the hydraulic lifting system. The spherical structure is adopted for segmented assembly and overall lifting, the construction speed is high, and safety and reliability are achieved.
本发明公开了一种球形网架悬挂拼装整体提升施工方法,属于网架结构施工技术领域。本发明的步骤为:步骤1:根据球形网架结构组成形式,应用Midas/Gen有限元分析软件建立网架结构有限元分析模型;步骤2:根据步骤1的分析验证结果结合结构实际空间尺寸划分球形网架结构的拼接及提升阶段或提升高度;步骤3、设置提升平台和提升吊点,安装液压同步提升系统;步骤4、每提升一个高度后重复进行步骤2中的下一提升单元的拼装和步骤3中的下一提升单元提升过程;步骤5、将步骤4中拼装完成的整球结构继续提升至距设计标高100‑200mm处;步骤6、进行液压提升系统逐级卸载。本发明采用球形结构分段拼装整体提升,施工速率高,安全可靠。
Integral lifting construction method for hanging and assembling spherical net rack
一种球形网架悬挂拼装整体提升施工方法
YANG YESONG (Autor:in) / CAI DONGYI (Autor:in) / LI HONGLI (Autor:in)
07.07.2020
Patent
Elektronische Ressource
Chinesisch
Integral lifting type peripheral protection hanging frame and lifting method
Europäisches Patentamt | 2021
|Large-volume steel net rack integral lifting device and construction method
Europäisches Patentamt | 2021
|Integral lifting construction method for large-span net rack roof structure
Europäisches Patentamt | 2020
|