Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated component connecting structure and construction method thereof
The invention discloses a fabricated component connecting structure and a construction method thereof. The fabricated component connecting structure comprises a first prefabricated piece, a second prefabricated piece, square steel pipes, a groove and automatic stud devices, the multiple square steel pipes are pre-buried in the connecting face of the first prefabricated piece, grooves correspondingto the square steel pipes in number and position are reserved in the connecting face of the second prefabricated piece, the automatic stud devices are pre-buried in the top faces and the bottom facesof the grooves, when the square steel pipes pre-buried in the first prefabricated piece are inserted into the grooves in the second prefabricated piece, the square steel pipes push stud covers of theautomatic stud devices to move in slideway grooves, finally the stud covers fall off, and the studs in the automatic stud devices are popped out and inserted into stud holes of the square steel pipesto achieve connection of the first prefabricated piece and the second prefabricated piece. According to the fabricated component connecting structure and the construction method thereof, constructionis easy and convenient, connection is reliable, connection of fabricated components can be quickly achieved, and the fabricated component connecting structure has a great significance in quick construction.
本发明公开了一种装配式构件连接结构及施工方法,该装配式构件连接结构包括第一预制件、第二预制件、方钢管、凹槽和自动栓钉装置,第一预制件连接面预埋若干个方钢管,第二预制件连接面预留与方钢管相应数量及对应位置凹槽,凹槽顶、底面预埋自动栓钉装置,当第一预制件的预埋方钢管插入第二预制件的凹槽中时,方钢管推动自动栓钉装置的栓钉盖在滑道槽中移动并最终使其脱落,自动栓钉装置中的栓钉弹出,插入到方钢管的栓钉孔中,实现第一预制件与第二预制件的连接。本发明施工简便,连接可靠,可快速实现装配式构件的连接,对快速施工具有重要意义。
Fabricated component connecting structure and construction method thereof
The invention discloses a fabricated component connecting structure and a construction method thereof. The fabricated component connecting structure comprises a first prefabricated piece, a second prefabricated piece, square steel pipes, a groove and automatic stud devices, the multiple square steel pipes are pre-buried in the connecting face of the first prefabricated piece, grooves correspondingto the square steel pipes in number and position are reserved in the connecting face of the second prefabricated piece, the automatic stud devices are pre-buried in the top faces and the bottom facesof the grooves, when the square steel pipes pre-buried in the first prefabricated piece are inserted into the grooves in the second prefabricated piece, the square steel pipes push stud covers of theautomatic stud devices to move in slideway grooves, finally the stud covers fall off, and the studs in the automatic stud devices are popped out and inserted into stud holes of the square steel pipesto achieve connection of the first prefabricated piece and the second prefabricated piece. According to the fabricated component connecting structure and the construction method thereof, constructionis easy and convenient, connection is reliable, connection of fabricated components can be quickly achieved, and the fabricated component connecting structure has a great significance in quick construction.
本发明公开了一种装配式构件连接结构及施工方法,该装配式构件连接结构包括第一预制件、第二预制件、方钢管、凹槽和自动栓钉装置,第一预制件连接面预埋若干个方钢管,第二预制件连接面预留与方钢管相应数量及对应位置凹槽,凹槽顶、底面预埋自动栓钉装置,当第一预制件的预埋方钢管插入第二预制件的凹槽中时,方钢管推动自动栓钉装置的栓钉盖在滑道槽中移动并最终使其脱落,自动栓钉装置中的栓钉弹出,插入到方钢管的栓钉孔中,实现第一预制件与第二预制件的连接。本发明施工简便,连接可靠,可快速实现装配式构件的连接,对快速施工具有重要意义。
Fabricated component connecting structure and construction method thereof
一种装配式构件连接结构及施工方法
WANG WENWEI (Autor:in) / XUE YANJIE (Autor:in) / LIANG LIANG (Autor:in) / RU ZHIMIN (Autor:in) / HU CHUANKAI (Autor:in) / WANG LU (Autor:in) / LI XIA (Autor:in) / ZHOU CHANG (Autor:in) / ZHU ZHONGFENG (Autor:in) / SONG WEIHAO (Autor:in)
14.07.2020
Patent
Elektronische Ressource
Chinesisch
Fabricated component connecting structure and construction method
Europäisches Patentamt | 2024
|Fabricated building steel structure connecting component and construction method thereof
Europäisches Patentamt | 2024
|Fabricated building steel structure connecting component and construction method thereof
Europäisches Patentamt | 2024
|Fabricated concrete connecting structure and construction method thereof
Europäisches Patentamt | 2022
|Fabricated wall connecting structure and construction method thereof
Europäisches Patentamt | 2020
|