Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building body pile hole automatic blocking module
The invention discloses a building body pile hole automatic blocking module. The building body pile hole automatic blocking module comprises a cement fixing module corresponding to a pipe pile hole and a cement sliding module, a circle of supporting steel bars are arranged on the cement fixing module, water bag pipes are correspondingly arranged on the supporting steel bars, water chambers are correspondingly formed in the water bag pipes, first pull ropes for pulling the water bag pipes to break are correspondingly arranged on the cement sliding module, a sleeve pipe is installed on the cement fixing module and the cement sliding module in a sleeving mode, a cement chamber is formed between the cement fixing module, the cement sliding module and the sleeve pipe, dry cement is arranged inthe cement chamber, and a circle of inclined elastic pressing sheets are arranged on the cement fixing module. The sleeve pipe is put into the pipe pile hole, the first pull ropes are pulled to breakthe water bag pipes, thus water flows out and pours the cement, and the purpose of blocking the pipe pile hole is achieved.
本发明公开了一种建筑楼体桩孔自动封堵模块,包括有一个和管桩孔相对应的水泥固定模块和水泥滑动模块,所述水泥固定模块上设置有一圈支撑钢筋,所述水泥滑动模块上设置有余所述支撑钢筋相对应的第一滑孔,所述支撑钢筋上分别设置有一个水袋管,所述水袋管内分别设置有一个水腔,所述水泥滑动模块上分别设置有拉动水袋管破裂的第一拉绳,所述水泥固定模块和水泥滑动模块上套装有一个套管,所述水泥固定模块、水泥滑动模块和套管之间构成一个水泥腔,水泥腔内设置有干燥水泥,所述水泥固定模块上设置有一圈呈倾斜状弹压片,通过套管投入到管桩孔内,拉动第一拉绳使水袋管破裂,从而使水流出对水泥进行浇灌,从而达到封堆管桩孔的目的。
Building body pile hole automatic blocking module
The invention discloses a building body pile hole automatic blocking module. The building body pile hole automatic blocking module comprises a cement fixing module corresponding to a pipe pile hole and a cement sliding module, a circle of supporting steel bars are arranged on the cement fixing module, water bag pipes are correspondingly arranged on the supporting steel bars, water chambers are correspondingly formed in the water bag pipes, first pull ropes for pulling the water bag pipes to break are correspondingly arranged on the cement sliding module, a sleeve pipe is installed on the cement fixing module and the cement sliding module in a sleeving mode, a cement chamber is formed between the cement fixing module, the cement sliding module and the sleeve pipe, dry cement is arranged inthe cement chamber, and a circle of inclined elastic pressing sheets are arranged on the cement fixing module. The sleeve pipe is put into the pipe pile hole, the first pull ropes are pulled to breakthe water bag pipes, thus water flows out and pours the cement, and the purpose of blocking the pipe pile hole is achieved.
本发明公开了一种建筑楼体桩孔自动封堵模块,包括有一个和管桩孔相对应的水泥固定模块和水泥滑动模块,所述水泥固定模块上设置有一圈支撑钢筋,所述水泥滑动模块上设置有余所述支撑钢筋相对应的第一滑孔,所述支撑钢筋上分别设置有一个水袋管,所述水袋管内分别设置有一个水腔,所述水泥滑动模块上分别设置有拉动水袋管破裂的第一拉绳,所述水泥固定模块和水泥滑动模块上套装有一个套管,所述水泥固定模块、水泥滑动模块和套管之间构成一个水泥腔,水泥腔内设置有干燥水泥,所述水泥固定模块上设置有一圈呈倾斜状弹压片,通过套管投入到管桩孔内,拉动第一拉绳使水袋管破裂,从而使水流出对水泥进行浇灌,从而达到封堆管桩孔的目的。
Building body pile hole automatic blocking module
一种建筑楼体桩孔自动封堵模块
17.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Intelligent portable automatic plugging device for building pile hole
Europäisches Patentamt | 2020
|Building foundation pile hole forming detection method
Europäisches Patentamt | 2021
|Prestressed concrete pipe pile hole anti-blocking protection device and method thereof
Europäisches Patentamt | 2023
|Underpinning pile construction method using building body pile foundation
Europäisches Patentamt | 2024
|