Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building body pile hole automatic plugging device
The invention discloses a building body pile hole automatic plugging device. The building body pile hole automatic plugging device comprises a sliding platform, a fixed shaft body is arranged on the sliding platform, a sliding control machine body is arranged on the fixed shaft body, a sliding plug block is arranged on the control machine body, a sliding plug block is arranged on the fixed shaft body, a sliding control sliding shaft is further arranged on the central axis of the plug block, one end of the control sliding shaft is fixedly connected to the control machine body, the other end ofthe control sliding shaft is provided with at least one swinging jacking rod, a sealing disc is arranged between every two adjacent jacking rods, one end of a pile hole can be sealed through the plugblock, and the other end of the pile hole is sealed through the sealing disc, so that the pile hole is located in a closed space, the purpose of sealing the pile hole can be achieved after cement is poured into the pile hole, the trouble caused by manual sealing is further avoided, and the effic
本发明公开了一种建筑楼体桩洞自动封堵装置,包括有一个滑动平台,所述滑动平台上设置有一个固定轴体,所述固定轴体上设置有一个滑动的控制机体,所述控制机体上设置有滑动的塞块,所述塞块中心轴线上还设置有一个滑动的控制滑轴,控制滑轴的一端固定连接在所述控制机体上,所述控制滑轴的另一端设置有至少个摆动的顶压杆,相邻两顶压杆之间设置有密封盘,能够通过塞块对桩孔的一端进行密封,通过密封盘对桩孔的另一端进行密封,从而使桩孔处于一个密闭的空间,在桩孔内灌入水泥后能够达到密封桩孔的目的,进一步的避免了人工密封造成的麻烦,从而提高效率。
Building body pile hole automatic plugging device
The invention discloses a building body pile hole automatic plugging device. The building body pile hole automatic plugging device comprises a sliding platform, a fixed shaft body is arranged on the sliding platform, a sliding control machine body is arranged on the fixed shaft body, a sliding plug block is arranged on the control machine body, a sliding plug block is arranged on the fixed shaft body, a sliding control sliding shaft is further arranged on the central axis of the plug block, one end of the control sliding shaft is fixedly connected to the control machine body, the other end ofthe control sliding shaft is provided with at least one swinging jacking rod, a sealing disc is arranged between every two adjacent jacking rods, one end of a pile hole can be sealed through the plugblock, and the other end of the pile hole is sealed through the sealing disc, so that the pile hole is located in a closed space, the purpose of sealing the pile hole can be achieved after cement is poured into the pile hole, the trouble caused by manual sealing is further avoided, and the effic
本发明公开了一种建筑楼体桩洞自动封堵装置,包括有一个滑动平台,所述滑动平台上设置有一个固定轴体,所述固定轴体上设置有一个滑动的控制机体,所述控制机体上设置有滑动的塞块,所述塞块中心轴线上还设置有一个滑动的控制滑轴,控制滑轴的一端固定连接在所述控制机体上,所述控制滑轴的另一端设置有至少个摆动的顶压杆,相邻两顶压杆之间设置有密封盘,能够通过塞块对桩孔的一端进行密封,通过密封盘对桩孔的另一端进行密封,从而使桩孔处于一个密闭的空间,在桩孔内灌入水泥后能够达到密封桩孔的目的,进一步的避免了人工密封造成的麻烦,从而提高效率。
Building body pile hole automatic plugging device
一种建筑楼体桩洞自动封堵装置
03.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Intelligent portable automatic plugging device for building pile hole
Europäisches Patentamt | 2020
|Automatic screw hole plugging device and plugging method
Europäisches Patentamt | 2024
|Hole plugging device and building floor stand pipe hole plugging construction method
Europäisches Patentamt | 2021
|Supporting pile inter-pile plugging device and plugging construction method
Europäisches Patentamt | 2024
|