Fabricated bent cap auxiliary installation structure and construction method thereof
The invention relates to the technical field of bent caps, and discloses a fabricated bent cap auxiliary installation structure and a construction method thereof. The fabricated bent cap auxiliary installation structure comprises a first steel stand column, a second steel stand column, a third steel stand column, a fourth steel stand column, first profile steel, I-shaped steels, an adjusting module and a bent cap. The auxiliary installation structure is simple in overall structure, and through the arrangement of the adjusting module and the construction of a bedding mortar process, the bent cap does not need to be subjected to component correction during secondary hoisting, so that the construction quality of bedding mortar is not affected; and meanwhile, the construction period of the auxiliary installation structure for the fabricated bent cap is greatly shortened by matching with the construction of prefabricated components; and the quality of prestress construction is guaranteed through two times of tensioning processes.
本发明涉及盖梁技术领域,公开了一种装配式盖梁辅助安装结构及施工方法,装配式盖梁辅助安装结构包括第一钢立柱、第二钢立柱、第三钢立柱、第四钢立柱、第一型钢、工字钢、调节模块和盖梁。整体结构简单,通过调节模块的设置以及坐浆工艺的施工,使得盖梁在第二次吊装时无需再进行构件校正,故而不会影响坐浆的施工质量,同时配合预制构件的施工,大大缩短了装配式盖梁辅助安装结构的工期;且通过两次张拉工艺,保证了预应力施工的质量。
Fabricated bent cap auxiliary installation structure and construction method thereof
The invention relates to the technical field of bent caps, and discloses a fabricated bent cap auxiliary installation structure and a construction method thereof. The fabricated bent cap auxiliary installation structure comprises a first steel stand column, a second steel stand column, a third steel stand column, a fourth steel stand column, first profile steel, I-shaped steels, an adjusting module and a bent cap. The auxiliary installation structure is simple in overall structure, and through the arrangement of the adjusting module and the construction of a bedding mortar process, the bent cap does not need to be subjected to component correction during secondary hoisting, so that the construction quality of bedding mortar is not affected; and meanwhile, the construction period of the auxiliary installation structure for the fabricated bent cap is greatly shortened by matching with the construction of prefabricated components; and the quality of prestress construction is guaranteed through two times of tensioning processes.
本发明涉及盖梁技术领域,公开了一种装配式盖梁辅助安装结构及施工方法,装配式盖梁辅助安装结构包括第一钢立柱、第二钢立柱、第三钢立柱、第四钢立柱、第一型钢、工字钢、调节模块和盖梁。整体结构简单,通过调节模块的设置以及坐浆工艺的施工,使得盖梁在第二次吊装时无需再进行构件校正,故而不会影响坐浆的施工质量,同时配合预制构件的施工,大大缩短了装配式盖梁辅助安装结构的工期;且通过两次张拉工艺,保证了预应力施工的质量。
Fabricated bent cap auxiliary installation structure and construction method thereof
一种装配式盖梁辅助安装结构及施工方法
ZHANG XIAO (Autor:in) / TANG XULIN (Autor:in) / MO LI (Autor:in) / HE BINGQUAN (Autor:in) / WU BENGANG (Autor:in) / LIU CHUNLEI (Autor:in) / YI QINGSONG (Autor:in) / JIANG HANGBO (Autor:in)
24.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Fabricated bent cap connection construction method and bent cap connection structure
Europäisches Patentamt | 2023
|Fabricated steel-concrete bent cap and construction method thereof
Europäisches Patentamt | 2021
|Construction auxiliary installation device and construction method thereof
Europäisches Patentamt | 2022