Steel assembled composite concrete building and construction method thereof
The invention discloses a steel assembled composite concrete building and a construction method thereof. The steel assembled composite concrete building comprises a plurality of steel prefabricated house modules (10), the prefabricated house modules (10) are provided with stand columns (1) of hollow steel pipe structures, inner cavities of the stand columns (1) are provided with penetrating steelbars (2) in an inserted mode and are poured with concrete, and the tops of the penetrating steel bars (2) protrude upwards out of the stand columns (1) of the prefabricated house modules (10) and areinserted into the inner cavities of the stand columns (1) of the prefabricated house modules (10) in the upper layers. According to the steel assembled composite concrete building and the constructionmethod thereof, the steel prefabricated house modules in the steel assembled composite concrete building can be prefabricated in a factory and then are transported to a construction site for rapid assembly, so that the construction period is greatly shortened, steel members do not need to be connected through bolts or in a welded mode, the surface is bright, clean and attractive, the maintenanceis convenient, and in addition, the fireproof performance is good.
本发明公开了一种钢制组装合成混凝土建筑及其建造方法,所述钢制组装合成混凝土建筑包括多个钢制的预制房模块(10);所述预制房模块(10)具有空心钢管结构的立柱(1),该立柱(1)内腔插有贯穿钢筋(2)并浇灌有混凝土,该贯穿钢筋(2)的顶部向上突伸出该预制房模块(10)的立柱(1)外并插入上一层预制房模块(10)的立柱(1)内腔。本发明的钢制组装合成混凝土建筑中的钢制预制房模块可以在工厂预制好,然后运至施工现场快速组装,极大缩短了施工工期,钢构件无需通过螺栓或焊接方式连接,表面光洁美观,方便维修保养,且防火性能好。
Steel assembled composite concrete building and construction method thereof
The invention discloses a steel assembled composite concrete building and a construction method thereof. The steel assembled composite concrete building comprises a plurality of steel prefabricated house modules (10), the prefabricated house modules (10) are provided with stand columns (1) of hollow steel pipe structures, inner cavities of the stand columns (1) are provided with penetrating steelbars (2) in an inserted mode and are poured with concrete, and the tops of the penetrating steel bars (2) protrude upwards out of the stand columns (1) of the prefabricated house modules (10) and areinserted into the inner cavities of the stand columns (1) of the prefabricated house modules (10) in the upper layers. According to the steel assembled composite concrete building and the constructionmethod thereof, the steel prefabricated house modules in the steel assembled composite concrete building can be prefabricated in a factory and then are transported to a construction site for rapid assembly, so that the construction period is greatly shortened, steel members do not need to be connected through bolts or in a welded mode, the surface is bright, clean and attractive, the maintenanceis convenient, and in addition, the fireproof performance is good.
本发明公开了一种钢制组装合成混凝土建筑及其建造方法,所述钢制组装合成混凝土建筑包括多个钢制的预制房模块(10);所述预制房模块(10)具有空心钢管结构的立柱(1),该立柱(1)内腔插有贯穿钢筋(2)并浇灌有混凝土,该贯穿钢筋(2)的顶部向上突伸出该预制房模块(10)的立柱(1)外并插入上一层预制房模块(10)的立柱(1)内腔。本发明的钢制组装合成混凝土建筑中的钢制预制房模块可以在工厂预制好,然后运至施工现场快速组装,极大缩短了施工工期,钢构件无需通过螺栓或焊接方式连接,表面光洁美观,方便维修保养,且防火性能好。
Steel assembled composite concrete building and construction method thereof
钢制组装合成混凝土建筑及其建造方法
HUANG TIANXIANG (Autor:in) / HUANG HUIMIN (Autor:in)
28.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Segmental prefabricated assembled steel-concrete composite beam and construction method thereof
Europäisches Patentamt | 2023
|Segmental prefabricated assembled steel-concrete composite beam and construction method thereof
Europäisches Patentamt | 2023
|Segmental assembled steel-concrete composite continuous beam and construction method thereof
Europäisches Patentamt | 2021
|Construction method for assembled composite wall building by concrete composite modules
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2020
|