Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated building concrete precast stair installation construction process
The invention relates to a fabricated building concrete precast stair installation construction process which comprises a fixed base, movable plates, support seats, primary fixing mechanisms, secondary fixing mechanisms and trigger rods. A sliding chute is formed in the top part of the fixed base; the movable plates are arranged at the upper end of the sliding chute and are locked with the fixed base through bolts; the two movable plates are connected through plug-in sleeves; hydraulic push rods are arranged on a gap between the two movable plates; the support seats are movably arranged on theupper end face of the movable plate located at the uppermost end of the fixed base; the secondary fixing mechanisms are arranged on the top parts of the support seats; the primary fixing mechanisms are connected to one sides of the secondary fixing mechanisms; the trigger rods are connected to the outer walls of the two support seats in a sleeving way through Z-shaped rods; and movable grooves are formed in the bottom parts of the support seats. According to the fabricated building concrete precast stair installation construction process provided by the invention, the safety in precast stairassembling is effectively improved, and a precast stair is positioned through a fast and convenient manner.
本发明涉及一种装配式建筑混凝土预制楼梯安装施工工艺,包括固定底座、活动板、支撑座、初级固定机构、次级固定机构和触发杆,固定底座的顶部开设有滑槽,滑槽的上端安装有活动板,且活动板与固定底座之间通过螺栓锁紧,两个所述活动板之间通过插接套筒连接,且两个所述活动板的间隙处安装有液压推杆,位于固定底座最上端的所述活动板的上端面活动安装有支撑座,支撑座的顶部安装有次级固定机构,次级固定机构的一侧连接有初级固定机构,触发杆通过Z型杆分别套接在两个所述支撑座的外壁,支撑座的底部开设有活动槽,本发明,有效的增加了预制楼梯装配的安全性,且通过快速的便捷的方式实现预制楼梯的定位工作。
Fabricated building concrete precast stair installation construction process
The invention relates to a fabricated building concrete precast stair installation construction process which comprises a fixed base, movable plates, support seats, primary fixing mechanisms, secondary fixing mechanisms and trigger rods. A sliding chute is formed in the top part of the fixed base; the movable plates are arranged at the upper end of the sliding chute and are locked with the fixed base through bolts; the two movable plates are connected through plug-in sleeves; hydraulic push rods are arranged on a gap between the two movable plates; the support seats are movably arranged on theupper end face of the movable plate located at the uppermost end of the fixed base; the secondary fixing mechanisms are arranged on the top parts of the support seats; the primary fixing mechanisms are connected to one sides of the secondary fixing mechanisms; the trigger rods are connected to the outer walls of the two support seats in a sleeving way through Z-shaped rods; and movable grooves are formed in the bottom parts of the support seats. According to the fabricated building concrete precast stair installation construction process provided by the invention, the safety in precast stairassembling is effectively improved, and a precast stair is positioned through a fast and convenient manner.
本发明涉及一种装配式建筑混凝土预制楼梯安装施工工艺,包括固定底座、活动板、支撑座、初级固定机构、次级固定机构和触发杆,固定底座的顶部开设有滑槽,滑槽的上端安装有活动板,且活动板与固定底座之间通过螺栓锁紧,两个所述活动板之间通过插接套筒连接,且两个所述活动板的间隙处安装有液压推杆,位于固定底座最上端的所述活动板的上端面活动安装有支撑座,支撑座的顶部安装有次级固定机构,次级固定机构的一侧连接有初级固定机构,触发杆通过Z型杆分别套接在两个所述支撑座的外壁,支撑座的底部开设有活动槽,本发明,有效的增加了预制楼梯装配的安全性,且通过快速的便捷的方式实现预制楼梯的定位工作。
Fabricated building concrete precast stair installation construction process
一种装配式建筑混凝土预制楼梯安装施工工艺
GUO JINSHENG (Autor:in) / WANG LIN (Autor:in)
28.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Fabricated stair, construction method applying fabricated stair and building structure
Europäisches Patentamt | 2022
|Fabricated stair and installation and construction method
Europäisches Patentamt | 2023
|Fabricated stair and installation and construction method
Europäisches Patentamt | 2023
|