Hanging swimming pool steel truss hoisting method
The invention relates to a hanging swimming pool steel truss hoisting method. A fixed frame and a pre-assembled fixing frame are installed on an outer wall of a building in advance. The method is characterized by comprising the following step that preparation is made, wherein splicing bed-jigs are arranged between two adjacent buildings, and hanging swimming pool steel truss parts are conveyed onto the splicing bed-jigs; S1, a steel truss is spliced on the splicing bed-jigs, and hoisting points are determined according to the shape and structural strength of the steel truss; S2, hoisting toolsare arranged at the hoisting points on the steel truss; S3, hydraulic lifters are arranged on the opposite sides of the two buildings, and steel strand vertical fall points on the hydraulic lifters are opposite to the hoisting tools on the steel truss; and S4, steel strands are connected with the hoisting tools on the top of the hanging swimming pool steel truss respectively. By means of the hoisting method, the whole steel truss is lifted directly, installation steps of a hanging swimming pool are simplified, the installation period of the hanging swimming pool is shortened, and the installation cost of the hanging swimming pool is reduced.
本发明涉及一种空中泳池钢桁架吊装方法,建筑外墙已预先安装好固定框架以及预装固定架,其技术要点是,包括以下步骤:准备步骤:在相邻两建筑之间设置拼装胎架,将空中泳池钢桁架零部件运送至拼装胎架上;步骤S1:在拼装胎架上拼装钢桁架,根据钢桁架的形状以及结构强度确定吊点;步骤S2:与钢桁架的吊点上设置吊具;步骤S3:根据吊点位置于两建筑物相对一侧设置液压提升器,液压提升器上的钢绞线垂直落点与钢桁架上的吊具相对;步骤S4:将钢绞线分别与空中泳池钢桁架顶部的吊具连接。本吊装方法通过直接对整个钢桁架提升,简化了空中泳池的安装步骤,缩短了空中泳池的安装周期,降低了空中泳池的安装成本。
Hanging swimming pool steel truss hoisting method
The invention relates to a hanging swimming pool steel truss hoisting method. A fixed frame and a pre-assembled fixing frame are installed on an outer wall of a building in advance. The method is characterized by comprising the following step that preparation is made, wherein splicing bed-jigs are arranged between two adjacent buildings, and hanging swimming pool steel truss parts are conveyed onto the splicing bed-jigs; S1, a steel truss is spliced on the splicing bed-jigs, and hoisting points are determined according to the shape and structural strength of the steel truss; S2, hoisting toolsare arranged at the hoisting points on the steel truss; S3, hydraulic lifters are arranged on the opposite sides of the two buildings, and steel strand vertical fall points on the hydraulic lifters are opposite to the hoisting tools on the steel truss; and S4, steel strands are connected with the hoisting tools on the top of the hanging swimming pool steel truss respectively. By means of the hoisting method, the whole steel truss is lifted directly, installation steps of a hanging swimming pool are simplified, the installation period of the hanging swimming pool is shortened, and the installation cost of the hanging swimming pool is reduced.
本发明涉及一种空中泳池钢桁架吊装方法,建筑外墙已预先安装好固定框架以及预装固定架,其技术要点是,包括以下步骤:准备步骤:在相邻两建筑之间设置拼装胎架,将空中泳池钢桁架零部件运送至拼装胎架上;步骤S1:在拼装胎架上拼装钢桁架,根据钢桁架的形状以及结构强度确定吊点;步骤S2:与钢桁架的吊点上设置吊具;步骤S3:根据吊点位置于两建筑物相对一侧设置液压提升器,液压提升器上的钢绞线垂直落点与钢桁架上的吊具相对;步骤S4:将钢绞线分别与空中泳池钢桁架顶部的吊具连接。本吊装方法通过直接对整个钢桁架提升,简化了空中泳池的安装步骤,缩短了空中泳池的安装周期,降低了空中泳池的安装成本。
Hanging swimming pool steel truss hoisting method
一种空中泳池钢桁架吊装方法